Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
(Rf S) Document For Setting Up Of 125 Mw/ 500 M Wh Standalone Bess In Kerala With Vgf (Ess Iii)
|
| Description |
(Rf S) Document For Setting Up Of 125 Mw/ 500 M Wh Standalone Bess In Kerala With Vgf (Ess Iii)
|
| Organisation | Solar Energy Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_SECI_783376_1 |
|
Reference Number |
SECI/CnP/ESS-III/500MWh |
| Tender Fee | 59000 |
| EMD | 3.41 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1087601 |
| Start Date | December 30, 2024 21:30 |
| End Date |
Expired
04/03/2025
Expired 594 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreSelection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreDesign, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Design, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Read moreRfs for selection of solar power developer for setting up 100 mw grid connected floating solar power project
Rfs for selection of solar power developer for setting up 100 mw grid connected floating solar pv power project at tansa and/or modak sagar dam on design-finance-build-own-operate-transfer through tariff based competative bidding process.
Read moreDevelopment, operation and maintenance of 1000 mw (ac) ground mounted solar pv projects integrated with 2000 mwh (2-hour) battery energy storage system (bess) in the state of karnataka through tariff based competitive bidding with applicable e-reverse auction
Development, operation and maintenance of 1000 mw (ac) ground mounted solar pv projects integrated with 2000 mwh (2-hour) battery energy storage system (bess) in the state of karnataka through tariff based competitive bidding with applicable e-reverse auction
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read more(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
Read moreRfs for setting up of 1000 mw/2000 mwh standalone battery energy storage systems in india (ess-2)
Rfs for setting up of 1000 mw/2000 mwh standalone battery energy storage systems in india (ess-2)
Read moreRfs for setting up 2000 mw ists-connected solar pv power projects with 1000 mw/4000 mwh ess in india (seci-ists-xvii)
Rfs for setting up 2000 mw ists-connected solar pv power projects with 1000 mw/4000 mwh ess in india (seci-ists-xvii)
Read moreof your Industry type