Tender Details

Particulars Details
Title
Rf S For Setting Up Of 1000 Mw/2000 M Wh Standalone Battery Energy Storage Systems In India (Ess 2)
Description
Rf S For Setting Up Of 1000 Mw/2000 M Wh Standalone Battery Energy Storage Systems In India (Ess 2)
Organisation Solar Energy Corporation of India Limited | Central Govt. Ministry/Department
Tender Id 2024_SECI_764019_1
Reference
Number
SECI/CnP/ESS-II/1000MW
Tender Fee 59000
EMD 3.41 Lakh
Tender Value -
Place New Delhi
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1067687

Start Date July 15, 2024 16:30
End Date
Expired 05/08/2024

Expired 798 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding

Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding

Read more
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Read more
Design, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited

Design, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited

Read more
Selection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys

Selection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys

Read more
Online bid for selection of the developer to establish the 900 mw/5400 mwh rampura pumped storage project in tonk, rajasthan, under the build-own-operate-transfer (boot) model through global tariff based competitive bidding followed by e-ra

Online bid for selection of the developer to establish the 900 mw/5400 mwh rampura pumped storage project in tonk, rajasthan, under the build-own-operate-transfer (boot) model through global tariff based competitive bidding followed by e-ra

Read more
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.

Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.

Read more
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

Read more
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)

Read more
Rfs for setting up 2000 mw ists-connected solar pv power projects with 1000 mw/4000 mwh ess in india (seci-ists-xvii)

Rfs for setting up 2000 mw ists-connected solar pv power projects with 1000 mw/4000 mwh ess in india (seci-ists-xvii)

Read more
2000 mw ists-connected solar pv power projects with 1000 mw/ 4000 mwh ess in india (seci-ists-xx)

2000 mw ists-connected solar pv power projects with 1000 mw/ 4000 mwh ess in india (seci-ists-xx)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise