Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rf S For Setting Up Of 1000 Mw/2000 M Wh Standalone Battery Energy Storage Systems In India (Ess 2)
|
| Description |
Rf S For Setting Up Of 1000 Mw/2000 M Wh Standalone Battery Energy Storage Systems In India (Ess 2)
|
| Organisation | Solar Energy Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_SECI_764019_1 |
|
Reference Number |
SECI/CnP/ESS-II/1000MW |
| Tender Fee | 59000 |
| EMD | 3.41 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1067687 |
| Start Date | July 15, 2024 16:30 |
| End Date |
Expired
05/08/2024
Expired 798 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreDesign, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Design, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Read moreSelection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys
Selection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys
Read moreOnline bid for selection of the developer to establish the 900 mw/5400 mwh rampura pumped storage project in tonk, rajasthan, under the build-own-operate-transfer (boot) model through global tariff based competitive bidding followed by e-ra
Online bid for selection of the developer to establish the 900 mw/5400 mwh rampura pumped storage project in tonk, rajasthan, under the build-own-operate-transfer (boot) model through global tariff based competitive bidding followed by e-ra
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read more(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
Read more(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
(rfs) document for setting up of 125 mw/ 500 mwh standalone bess in kerala with vgf (ess-iii)
Read moreRfs for setting up 2000 mw ists-connected solar pv power projects with 1000 mw/4000 mwh ess in india (seci-ists-xvii)
Rfs for setting up 2000 mw ists-connected solar pv power projects with 1000 mw/4000 mwh ess in india (seci-ists-xvii)
Read more2000 mw ists-connected solar pv power projects with 1000 mw/ 4000 mwh ess in india (seci-ists-xx)
2000 mw ists-connected solar pv power projects with 1000 mw/ 4000 mwh ess in india (seci-ists-xx)
Read moreof your Industry type