Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Battery Energy Storage System Package Bess 06 For 25 Mw/ 50 M Wh Battery Energy Storage System At Simhachalam Andhra Pradesh
|
| Description |
Battery Energy Storage System Package Bess 06 For 25 Mw/ 50 M Wh Battery Energy Storage System At Simhachalam Andhra Pradesh Associated With Setting Up Of 1,000 Mw/ 2,000 M Wh Battery Energy Storage System (Bess) In Andhra Pradesh Under Tariff Based Competitive Bidding With Viability Gap Funding Supported Through Psdf
|
| Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 26670 |
|
Reference Number |
CC/T/W-MISC/DOM/A00/25/15325 |
| Tender Fee | 25000 |
| EMD | 0 |
| Tender Value | - |
| Place | Andhra Pradesh |
| Link |
View Original Tender Notice
https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=fc934eba-31dd-4e7f-8f56-016e81185cd9 |
| Start Date | November 18, 2025 23:00 |
| End Date |
Expired
25/11/2025
Expired 327 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Read moreDesign, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Design, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreDevelopment, operation and maintenance of 1000 mw (ac) ground mounted solar pv projects integrated with 2000 mwh (2-hour) battery energy storage system (bess) in the state of karnataka through tariff based competitive bidding with applicable e-reverse auction
Development, operation and maintenance of 1000 mw (ac) ground mounted solar pv projects integrated with 2000 mwh (2-hour) battery energy storage system (bess) in the state of karnataka through tariff based competitive bidding with applicable e-reverse auction
Read moreProvision of battery energy storage system (bess) for power back up for climatic chamber.
Provision of battery energy storage system (bess) for power back up for climatic chamber.
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreSelection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys
Selection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys
Read moreSelection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read morePackage- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india
Package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india
Read moreRequest for qualification cum rfp for development of 200 mw (plus minus 10 percent) solar plant with 50 or 100mwh battery energy storage system under captive mode for ulbs of mp
Request for qualification cum rfp for development of 200 mw (plus minus 10 percent) solar plant with 50 or 100mwh battery energy storage system under captive mode for ulbs of mp
Read moreof your Industry type