Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fixed Part O M Cost For 2 G Ethanol Plant Mapower,Variable Part O M Cost For 2 G Ethanol Plant Manpow
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/4768213 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 12, 2024 21:38 |
| End Date |
Expired
25/03/2024
Expired 931 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
ISGEC HEAVY ENGINEERING LIMITED
196157350.1
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | ISGEC HEAVY ENGINEERING LIMITED | - | 10-05-2024 09:40:13 | Turnover >= 500 Cr. | MII N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ISGEC HEAVY ENGINEERING LIMITED(MII) | Item Categories : FIXED PART O M Cost for 2G ETHANOL PLANT MAPOWER,VARIABLE PART O M COST FOR 2G ETHANOL PLANT MANPOW | 206819004.10 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| FIXED PART O M Cost for 2G ETHANOL PLANT MAPOWER | NA | BOQ Item | 24 | ₹ 96344640.000 |
| VARIABLE PART O M COST FOR 2G ETHANOL PLANT MANPOWER | NA | BOQ Item | 24 | ₹ 63720000.000 |
| Hiring of 3T Forklifts grabbers payloaders lifting equipment on per hour rental basis | NA | BOQ Item | 3000 | ₹ 2083290.000 |
| DISMANTLING OF EQUIPMENT EXCLUDING HEAVY EQUIPMENT CHARGES or LIFTING EQUIPMENT | NA | BOQ Item | 10 | ₹ 37878.000 |
| 3T Forklift grabbers payloaders lifting equipment hiring on rental basis for 24 Hrs basis | NA | BOQ Item | 3000 | ₹ 14248500.000 |
| INSTN OF ROTATING EQUIPMENT UPTO 10 MT PUMP MIXER COMPRESSOR TURBINE ETC EXCL HEAVY EQUIPMENT CHARGES or LIFTING EQUIPMENT | NA | BOQ Item | 40 | ₹ 176764.000 |
| VESSELS COLUMNS DRUMs FILTERS INSTN UPTO 10 MT EXCL HEAVY EQPMNT or LIFTING EQPMNT CHARGES | NA | BOQ Item | 40 | ₹ 303024.000 |
| STATIC EQPMT HEAT EXCHNGRS, COOLERS, CONDENSRS UPTO 10 MT EXCL HEAVY EQMNT CHARGES LIFTING EQPMT INSTN | NA | BOQ Item | 40 | ₹ 343427.200 |
| VESSELS, COLUMNS,DRUMS, FILTERS INSTALLATION MORE THAN 10 MT AND UPTO 20 MT EXCLUDING HEAVY EQUIPMENT CHARGES ,LIFTING EQUIPMENT | NA | BOQ Item | 80 | ₹ 383830.400 |
| STATIC EQUIPMENT SUCH AS HEAT EXCHANGERS COOLERS CONDENSERS ETC. INSTALLATION MORE THAN 10 MT AND UPTO 20 MT EXCLUDING HEAVY EQUIPMENT CHARGES LIFTING EQUIPMENT | NA | BOQ Item | 80 | ₹ 424233.600 |
| STRIP LINING SS Lining OF COLUMN, VESSEL | NA | BOQ Item | 100 | ₹ 415950.000 |
| Monel OF COLUMN, VESSEL, STRIP LINING | NA | BOQ Item | 100 | ₹ 11092000.000 |
| FOAM CLEANING OF EXTERIOR FIN FAN COOLER Foam Cleaning of Cooler | NA | BOQ Item | 10 | ₹ 157825.000 |
| Mobilization charges Per Visit FOAM CLEANING OF EXTERIOR FIN FAN COOLER | NA | BOQ Item | 10 | ₹ 164138.000 |
| HEAT EXCHANGER REVISIONING TESTING SINGLE UNIT HAVING UPTO 150 TUBES FOR PIPES | NA | BOQ Item | 10 | ₹ 45453.600 |
| UPTO 150 TUBES FOR RTJ FLANGE | NA | BOQ Item | 10 | ₹ 45453.600 |
| UP TO 150 TUBES FOR CHANNEL BOX OPENING BOX UP | NA | BOQ Item | 10 | ₹ 45453.600 |
| FOR BUNDLE PULLING AND INSERTION UPTO 150 TUBES | NA | BOQ Item | 10 | ₹ 15151.200 |
| UPTO 150 TUBES BUNDLE CLEANING FROM INSIDE OUTSIDE SHELL CLEANING FOR HEAT EXCHANGER REVISIONING AND TESTING | NA | BOQ Item | 10 | ₹ 7575.600 |
| UP TO 150 TUBES FOR RING TEST | NA | BOQ Item | 10 | ₹ 126260.000 |
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read moreSupply of water at hpcl 2g ethanol bio refinery
Supply of water at hpcl 2g ethanol bio refinery
Read moreMisc. civil works for 2g bio ethanol refinery, barghar
Misc. civil works for 2g bio ethanol refinery, barghar
Read moreLstk works for feed dust removal system of 2g ethanol
Lstk works for feed dust removal system of 2g ethanol
Read moreValmet make spares of pt section of 2g ethanol plant
Valmet make spares of pt section of 2g ethanol plant
Read moreOperation & maintenance of 1g & 2g ethanol plant at bargarh, odisha
Operation & maintenance of 1g & 2g ethanol plant at bargarh, odisha
Read moreof your Industry type