Tender Details
Particulars | Details |
---|---|
Title |
Preparation Of Detail Estimate For Foot Ball Ground Demoliton Of Existing Compound Wall And Forming Up Of New Compound Wall With Ms.Grills At Loop Road In Div 126, Unit 25, Zone 09
|
Description |
Preparation Of Detail Estimate For Foot Ball Ground Demoliton Of Existing Compound Wall And Forming Up Of New Compound Wall With Ms.Grills At Loop Road In Div 126, Unit 25, Zone 09
|
Organisation | Corporation of Chennai | State Govt. and UT |
Tender Id | 2025_CoC_524039_1 |
Reference Number |
Z.O.9.C.No.E1/09152/2025 |
Tender Fee | 0 |
EMD | 18100 |
Tender Value | |
Place | Zone 9 (Nungambakkam) |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=623879 |
Start Date | February 10, 2025 23:30 |
End Date |
14/02/2025 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreTariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Tariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Read moreConstruction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall and dismantling of existing ohr ... in all respect of proposed water supply scheme at sishu bagan zone-10 raniganj under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d and dismantling of existing ohr ... in all respect of proposed water supply scheme at sishu bagan zone-10&#x0d raniganj under amrut 2.0 phase-iii within amc
Read moreConstruction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.
Read moreGeneral
Construction of cc drain both sides at turpu bazar east side 1st cross road , west side 2nd cross road providing shoulders for existing cc road at turpu bazar muslim burrial ground to kanna colony junction in div no.47 underunder guntur muncipal corporation
Read moreStrengthen up gradation widening of existing db road from dendua rail gate to bonjemhary rail crossing under salanpur block at paschim bardhaman zilla parishad in the district of paschim bardhaman for 2024-25
Strengthen up gradation widening of existing db road from dendua rail gate to bonjemhary rail crossing under salanpur block at paschim bardhaman zilla parishad in the district of paschim bardhaman for 2024-25
Read moreConstruction of silachari block public health unit (bphu) at silachari phc under 15th fc during 2024-25/s.h- building portion in/c sanitary installation, water supply arrangement and setting up basic civil requirements for lab unit.
Construction of silachari block public health unit (bphu) at silachari phc under 15th fc during 2024-25/s.h- building portion in/c sanitary installation, water supply arrangement and setting up basic civil requirements for lab unit.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of new high level bridge in place of existing bridge at chainage 2.0 km of deoghar to satar road under road division deoghar in the state of jharkhand.
Consultancy services for preparation of detailed project report (dpr) for construction of new high level bridge in place of existing bridge at chainage 2.0 km of deoghar to satar road under road division deoghar in the state of jharkhand.
Read moreof your Industry type