Tender Details
Particulars | Details |
---|---|
Title |
Strengthening To The Road At Chikkarampalayam Quarry Road R 146 Km 0/0 0/814 H/O Chikkarampalayam Panchayat Name Of The Scheme Mines And Minerals 7 2022 2023 2023 2024
|
Description |
Strengthening To The Road At Chikkarampalayam Quarry Road R 146 Km 0/0 0/814 H/O Chikkarampalayam Panchayat Name Of The Scheme Mines And Minerals 75 2022 2023 2023 2024)
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id | 2024_RDTN_513605_1 |
Reference Number |
Roc No 135/2024-2025/CKP Dt 24.12.2024 |
Tender Fee | 0 |
EMD | 50000 |
Tender Value | |
Place | Chikkarampalayam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=610910 |
Start Date | December 24, 2024 18:30 |
End Date |
02/01/2025 ( Expired 159 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreMacadamization of road at masjid noor bypass from h/o tayob ahmad nazki to aijaz ahmad bhat by way providing and laying 75 mm thick wet mix macadam, 50 mm thick bitiminous macadam,25 mm thick semidense and 6 mm thick irc type seal coat.
Macadamization of road at masjid noor bypass from h/o tayob ahmad nazki to aijaz ahmad bhat by way providing and laying 75 mm thick wet mix macadam, 50 mm thick bitiminous macadam,25 mm thick semidense and 6 mm thick irc type seal coat.
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreImprovement of g.a. road (nh-248a) to dhulawat via rojka meo, khor and ghusbethi from km. 0 to 9.90 in nuh distt. (road id 1064 and 1119) under nabard scheme ridf-xxx
Improvement of g.a. road (nh-248a) to dhulawat via rojka meo, khor and ghusbethi from km. 0 to 9.90 in nuh distt. (road id 1064 and 1119) under nabard scheme ridf-xxx
Read moreImprovement of bori kothi punhana road from km. 0 to 26.20 in nuh distt. (road id 1204 and 1305) under nabard scheme ridf-xxx
Improvement of bori kothi punhana road from km. 0 to 26.20 in nuh distt. (road id 1204 and 1305) under nabard scheme ridf-xxx
Read moreof your Industry type