Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Epc Tender For Iconic Hybrid Bridge Construction ๐๏ธ๐ The Ministry Of Road Transport And Highways, Central Government, Invites Tenders From Reputable Contractors For The Construction Of An Iconic Hybrid Cable Stayed And Suspension Bridge Across The Krishna River On Nh 167 K, From Design Chainage Km 87.360 To Km 88.437, In The States Of Telangana And Andhra Pradesh. ๐ Bid Submission Deadline: May 20, 2024, 3:00 Pm Tender Fee: Inr 1,18,000 Earnest Money Deposit (Emd): Inr 9,63,00,000 This Project Is On An Engineering, Procurement, And Construction (Epc) Basis And Requires A Contractor With Extensive Experience In Large Scale Infrastructure Projects. Interested Parties Should Submit Detailed Tenders, Including Technical And Financial Bids, By The Specified Deadline. Keywords: Construction, Hybrid Cable Stayed And Suspension Bridge, Iconic Project, Nh 167 K, Ministry Of Road Transport And Highways, Epc Tender, Telangana, Andhra Pradesh, Earnest Money Deposit, Tender Fee| Particulars | Details |
|---|---|
| Title |
Construction Of Iconic Hybrid Cable Stayed And Suspension Bridge Across Krishna River On Nh 167 K Design Chainage Km 87.360 To Km 88.437 In The States Of Telangana And Andhra Pradesh On Epc Basis
|
| Description |
Construction Of Iconic Hybrid Cable Stayed And Suspension Bridge Across Krishna River On Nh 167 K Design Chainage Km 87.360 To Km 88.437 In The States Of Telangana And Andhra Pradesh On Epc Basis
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2023_MoRTH_775191_1 |
|
Reference Number |
- |
| Tender Fee | 1.18 Lakh |
| EMD | 9.63 Crore |
| Tender Value | - |
| Place | Telangana |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=814903 |
| Start Date | October 07, 2023 20:30 |
| End Date |
Expired
03/11/2025
Expired 308 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreEngagement of user fee agency through e-tender at kurana fee plaza located at km ch. 42.876 (design chainage 47.900) of nh-235 in the section of meerut bulandshahr of hapur bypass of nh-24 (new nh-9) on nh235 in the state of up
Engagement of user fee agency through e-tender at kurana fee plaza located at km ch. 42.876 (design chainage 47.900) of nh-235 in the section of meerut bulandshahr of hapur bypass of nh-24 (new nh-9) on nh235 in the state of up
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreConstruction of missing link from birhu to lathiani into 4-lane and paved shoulder configuration from km 35.550 design chainage 0.000 to 42.800 design chainage 8.153 on nh 503a including cable stayed bridge 0.860 km on back water of govind sagar
Construction of missing link from birhu to lathiani into 4-lane and paved shoulder configuration from km 35.550 design chainage 0.000 to 42.800 design chainage 8.153 on nh 503a including cable stayed bridge 0.860 km on back water of govind sagar
Read moreFour laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Four laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Read moreFour laning of keyondpani to latra section of nh 143d ing from km 59.300 (design chainage) to km 103.000 (design chainage) (length 43.7 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iii)
Four laning of keyondpani to latra section of nh 143d ing from km 59.300 (design chainage) to km 103.000 (design chainage) (length 43.7 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iii)
Read moreFour laning of latra to ranchi (sithiyo) section of nh 143d ing from km 103.000 (design chainage) to km 149.950 (design chainage) (length 46.95 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iv)
Four laning of latra to ranchi (sithiyo) section of nh 143d ing from km 103.000 (design chainage) to km 149.950 (design chainage) (length 46.95 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iv)
Read moreFour laning of nh-146 from design chainage km 59.475 (existing chainage km 81.240 near vidisha) to design chainage km 88.600 (existing chainage km 110.315 near gyaraspur) in madhya pradesh on ham under bmp
Four laning of nh-146 from design chainage km 59.475 (existing chainage km 81.240 near vidisha) to design chainage km 88.600 (existing chainage km 110.315 near gyaraspur) in madhya pradesh on ham under bmp
Read moreConstruction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Read more4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
Read moreof your Industry type