Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Hl Major Bridge Across Dahuka River At Km 226.377 (Design Chainage) Of Nh 57 Including Approaches In The State Of Odisha On Epc Mode
|
| Description |
Construction Of Hl Major Bridge Across Dahuka River At Km 226.377 (Design Chainage) Of Nh 57 Including Approaches In The State Of Odisha On Epc Mode
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_755528_1 |
|
Reference Number |
08 CE NH of 2023-24 |
| Tender Fee | 11800 |
| EMD | 23.23 Lakh |
| Tender Value | |
| Place | O/o CE NHs Odisha Nirmana Saudha, Kesari Nagar,Pin |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | May 31, 2023 00:25 |
| End Date |
Expired
15/11/2023
Expired 961 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDetailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreEmergent maintenance work of the existing road of the project construction of 4 lane bridge over irang river on imphal jiribam road section 95.5 km nh 37 at the risk and cost of the epc contractor on percentage rate and work order basis 2nd call
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreof your Industry type