Tender Details
Particulars | Details |
---|---|
Title |
Deposit Deposit Work 202324 Urgent Restoration Work To Kodakara Vellikulangara Road From Km1 330 To 2 200 Restoration Work Due To Installation Of Jio Ug Cables Row 1030230 35813 General Civil Work
|
Description |
Deposit
|
Organisation | Government of Kerala |
Tender Id | 2024_PWD_639034_1 |
Reference Number |
PWD/RB/12275/2023-2024 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | PWD ROADS DIVISION THRISSUR |
Link | https://etenders.kerala.gov.in |
Start Date | January 03, 2024 23:30 |
End Date |
10/01/2024 ( Expired 504 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreConsultancy service for survey investigation and preparation of dpr for strengthening of 4-lane road with culvert from nh27 anta to siswali tiraha odr15 and 2 lane rob construction work at km 37/111 lc21 aspl of mangrol antasangod road (sh-51a)
Consultancy service for survey investigation and preparation of dpr for strengthening of 4-lane road with culvert from nh27 anta to siswali tiraha odr15 and 2 lane rob construction work at km 37/111 lc21 aspl of mangrol antasangod road (sh-51a)
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreGeneral bsp venniyode branch canal construction of branch canal ch 3975m to ch 4325m convertion of open canal to land barrel from ch 4300m to ch 4325m general civil work
General bsp venniyode branch canal construction of branch canal ch 3975m to&#x0d ch 4325m convertion of open canal to land barrel from ch 4300m to ch 4325m general&#x0d civil work&#x0d
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreDeposit work estimate for shifting ht and lt poles maintaining ground clearance from ht and lt lines due to increasing height of pdhrm road krfb under electrical section thakazhy
Deposit work estimate for shifting ht and lt poles maintaining ground clearance from ht and lt lines due to increasing height of pdhrm road krfb under electrical section thakazhy
Read moreAAAAAAAAAA
Login to viewRestoration work of rd pt with bituminous surface and hard shouldering related to proposed cutting ot of gp road from ..... marked j4 to naya bazar marked j3 having length of 782.00 m ch 5.618 to 6.40km for laying of ug 250mm dia d.i.pipe of kmda ...
Read moreReconstruction of four lane (1v x 6.00 mtrs span) slab culvert across ukkayapalli channel at km 1.300 of krishna circle to devuni kadpa road in ysr kadapa district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Reconstruction of four lane (1v x 6.00 mtrs span) slab culvert across ukkayapalli channel at km 1.300 of krishna circle to devuni kadapa road in y.s.r kadapa district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Read moreReconstruction of four lane minor bridge (1v x 10.00 mtrs span) at km 1.230 of krishna circle to devuni kadapa road in ysr district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Reconstruction of four lane minor bridge (1v x 10.00 mtrs span) at km 1.230 of krishna circle to devuni kadapa road in y.s.r kadapa district. under the main work of - krishna circle to devuni kadapa ( widening and strengthening of road from krishna theatre to devuni kadapa road via market yard from km 0/0 to 2/2)
Read moreof your Industry type