Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Work Of Npr Sirad Under The Item Of Construction Of New Classroom Building.
|
| Description |
Reconstruction Work Of Npr Sirad Under The Item Of Construction Of New Classroom Building.
|
| Organisation | Government of Uttarkhand |
| Tender Id | 2023_RES_65632_1 |
|
Reference Number |
1005 Dated 10-11-2023 |
| Tender Fee | 2360 |
| EMD | 44700 |
| Tender Value | |
| Place | EE RWD ALMORA |
| Link |
View Original Tender Notice
https://uktenders.gov.in |
| Start Date | November 17, 2023 20:30 |
| End Date |
Expired
27/11/2023
Expired 967 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreProvision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read more8946/e8
Term contract for artificer work at raspunja 
 mil camp under ge (c) kolkata
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type