Tender Details

Particulars Details
Title
Annual Repair And Maintenance Of Nh 154 I.E. Old Nh 21, Chandigarh Mandi Manali Road Between Km 173/900 To 179/600.
Description
Providing And Laying Bm For Correction Layer And 40mm Thick Bitumen Concrete, Road Marking, Cat Eyes, Delineator In Km 173/900 To 179/600, Total Length Is 6.100 Km.
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_104064_1
Reference
Number
PW-SNR-E-Tender Giriraj-322-29 dt 16.04.2025
Tender Fee 5000
EMD 5.36 Lakh
Tender Value
Place Sunder Nagar
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=152631
Start Date April 18, 2025 14:30
End Date

24/04/2025 ( Expired 24 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh

Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh

Read more
Short term maintenance of takhatpur ex. road from km. 26.542 to km. 32.093, mungeli ex. road from km. 45.786 to km. 56.275, pandariya ex. road from km. 82.582 to km. 87.133 and pondi ex. road from km. 103.166 to km. 104.756 on nh130a

Short term maintenance of takhatpur ex. road from km. 26.542 to km. 32.093, mungeli ex. road from km. 45.786 to km. 56.275, pandariya ex. road from km. 82.582 to km. 87.133 and pondi ex. road from km. 103.166 to km. 104.756 on nh130a

Read more
Construction of 4 nos. bridges at km 47.000 (jhiram nalla), km. 123.000 (kerlapal nalla), km. 127.800 (bodaguda nalla) and km. 137.400 (dubbatota nalla) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state of chhattisgarh on epc mode.

Construction of 4 nos. bridges at km 47.000 (jhiram nalla), km. 123.000 (kerlapal nalla), km. 127.800 (bodaguda nalla) and km. 137.400 (dubbatota nalla) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state of chhattisgarh on epc mode.

Read more
Construction of 5 nos. major bridges at km 88.200 (ful-chhindgarh river), km. 122.600 (malger river), km. 145.000 (penta nalah), km. 163.400 (errabor river) and km. 176.600 (injaram nalah) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state

Construction of 5 nos. major bridges at km 88.200 (ful-chhindgarh river), km. 122.600 (malger river), km. 145.000 (penta nalah), km. 163.400 (errabor river) and km. 176.600 (injaram nalah) on nh-30 (old nh-221) jagdalpur-sukma-konta road in the state

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise