Find the latest Hot Air Boiler tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Hot Air Boiler e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Procurement of m/s l and t howden private limited make hot end basket (part no.300/05,hs8 du element profile) installed in raph (rotary air pre-heater type 33-vat 1840) at boiler area of 2x660 mw,ph-ii, sstpp , dongalia
Procurement of m/s l and t howden private limited make hot end basket (part no.300/05,hs8 du element profile) installed in raph (rotary air pre-heater type 33-vat 1840) at boiler area of 2x660 mw,ph-ii, sstpp , dongalia
Sdstps
Break-down and running maintenance works for aluminum sheet and insulation for ducts (all elevations of primary air (cold and hot), hot secondary air and flue gas ) as and when required during the year 2025-26 for unit-1 boiler including tp and consumables
Overhauling of esp and ducting metallic bellow fabric compentorssa
Overhauling of esp and replacement/repairing of ducting (cold air ducts, hot primary air ducts, secondary air ducts, flue gas ducts etc.), metallic expansion bellows/rcej and fabric compensator/conveyor belt of boiler of unit-6, ptps, panipat
Mp-6139/ducting works/2024
Replacement / repairing of all types of ducting (cold air ducts, hot air ducts, flue gas ducts etc.) from boiler to chimney, metallic expansion bellows / round corner expansion joints (rcejs) of ducting and fabric compensator / conveyor belt from ou
Yadadri thermal power station
Tggenco ytps c andi unit4 assembling or dessembling , cleaning ,purging , testing, servicing, calibration and refixing of c and i equipments or instuments of main boiler , boiler auxiliaries id, fd, pa fans and lubeoil systems, blade pitch control dampers, guns and igniters, flame scanners, fuel oil valves and solenoids and instrumentation pertains to bowl mills,hot air and cold air gates of all mills, mill rejection system and gravimetric feeders, seal air and scanner air fans , sadcs power cylinders, smart positioners, transmitters, solenoid valves , limit switches, o2 analysers, aslds,seals replacement of pneumatic cylinders of had,cad,idf,paf,fdf dampers, burner tilt, movs pertaining to flue gas path gates and boiler valves, seperators and hwl valves, eco flow valves , bcw pumps, aph scaph system, soot blowing system, ervs, metal temperatures, flue gas temperatures, pressures and analysers and replacement of spare parts in unit 4 from commencement to 31.3.27
Yadadri thermal power station
Tggenco-ytps(5x800 mw)- c and i-unit-4 - assembling or dessembling , cleaning or purging , testing, servicing, calibration and refixing of c and i equipments or instuments of main boiler and boiler auxiliaries (id, fd, pa fans and luboil systems, blade pitch control dampers, guns and igniters, flame scanners, fuel oil valves and solenoids and instrumentation pertains to bowl mills,hot air and cold air gates of all mills, mill rejection system and gravimetric feeders, seal air and scanner air fans , sadcs power cylinders, smart positioners, transmitters, solenoid valves , limit switches, o2 analysers, aslds,seals replacement of pneumatic cylinders of had,cad,idf,paf,fdf dampers, burner tilt, movs pertaining to flue gas path gates and boiler valves, seperators and hwl valves, eco. flow valves , bcw pumps, aph and scaph system, soot blowing system, ervs, metal temperatures, flue gas replacement of spare parts if necessary) in unit4 offor the period from 01.04.2026 to 31.03.2027
Btps
Up-keeping at various locations such as boiler and turbine areas such as all lies, jbs, transmitters, rtds, thermocouples, positioners, switches, pneumatic control/block valves, movs, burner tilts and feeder floor area local control panels and lies, cold air dampers and hot air dampers, all heei igniters system hfo/lfo nozzle valves, sh and rh spray station, mill rejects area and zero meters, lp heaters floor, hp heaters floor, turbine floor, cw pump house area, battery room, deaerator floor instruments and any other area in the scope of boiler and turbine sub division as directed by engineer-in-charge in ic/stage-1/btps for the period of 01.04.2024 to 31.03.2025
🛠️ Bid Invitation for Boiler and Turbine Plant Services (BTPS) 🏭💥 The Information Technology Electronics and Communication Department, Telangana, invites bids for the maintenance and up-keeping of various critical components within the Boiler and Turbine Subdivision. 📅 Bid Submission Deadline: April 19, 2024, 2:00 PM Tender Fee: INR 316 EMD: INR 13,500 The scope of work includes maintenance of LIEs, JBs, transmitters, RTDs, Thermocouples, positioners, switches, pneumatic control/block valves, MOVs, burner tilts, Feeder floor area local control panels, LIEs, Cold air dampers, Hot air dampers, HEEI Igniters system HFO/LFO nozzle valves, SH and RH spray station, Mill rejects area, Zero Meters, LP Heaters Floor, HP Heaters Floor, Turbine Floor, CW Pump House area, Battery room, Deaerator Floor instruments, and any other areas as directed by the Engineer-in-charge in IC/Stage-1/BTPS for the period of 01.04.2024 to 31.03.2025. Interested bidders must submit detailed proposals, including technical capabilities, experience, and financial bids, to ensure the highest standards of maintenance and reliability for the Boiler and Turbine Plant Services. Keywords: BTPS, Maintenance, Boiler and Turbine, IT Electronics and Communication Department
Btps
Up-keeping at various locations such as boiler and turbine areas such as all lies jbs transmitters rtds thermocouples positioners switches pneumatic control block valves movs burner tilts and feeder floor area local control panels and lies cold air dampers and hot air dampers all heei igniters system hfo lfo nozzle valves sh and rh spray station mill rejects area and zero meters, lp heaters floor, hp heaters floor, turbine floor, cw pump house area battery room deaerator floor instruments and any other area in the scope of boiler and turbine sub division as directed by engineer-in-charge in i and c-stage-1-btps for the period of 01-04-2025 to 31-03-2026
Sdstps
Labour charges for surface preparation application of primer, application of paint for esp roof side plates and esp hoist structure, air tank of aph, aph structure area, hot pa common duct and duct pa duct structure and aph outlet to esp inlet structure esp to chimney inlet duct structure of boiler unit-i where ever necessary, including required consumables like buffing wheels wire brushes rust cleaner and excluding paint for the year 2025-26.