Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0.8 Mm Conforming To Is14246 For Coverage In 32 Mtr Elevation Above Hot Air Duct And 52 Mtr Elevation Above Walk Way In Unit I Ii And Iii Boiler
|
Description |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0.8 Mm Conforming To Is14246 For Coverage In 32 Mtr Elevation Above Hot Air Duct And 52 Mtr Elevation Above Walk Way In Unit I Ii And Iii Boiler
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_528941_1 |
Reference Number |
CE/TTPS/4199M |
Tender Fee | 0 |
EMD | 18700 |
Tender Value | |
Place | Tuticorin |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=629877 |
Start Date | March 01, 2025 18:30 |
End Date |
17/03/2025 ( Expired 36 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Read moreSupply of galvalume sheets of thickness not less than 0 8mm conforming to is14246 for coverage in 52mtr elevation near drum and in front of lift for unit i ii and iii boiler
Supply of galvalume sheets of thickness not less than 0 8mm conforming to is14246 for coverage in 52mtr elevation near drum and in front of lift for unit i ii and iii boiler
Read moreSupply of galvalume sheets of thickness not less than 0.8mm with accessories for roofing and four sides of boiler structure in unit v boiler
Supply of galvalume sheets of thickness not less than 0.8mm with accessories for roofing and four sides of boiler structure in unit v boiler
Read moreSupply and fixing of galvalume sheets of thickness not less than 0.8mm for roofing conforming to is14246 in unit i boiler as per technical specification
Supply and fixing of galvalume sheets of thickness not less than 0.8mm for roofing conforming to is14246 in unit i boiler as per technical specification
Read moreSupply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 52 mtr elevation four sides of unit i boiler
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 52 mtr elevation four sides of unit i boiler
Read moreSupply of galvalume sheets of thickness not less than 0.8mm for side coverage at 18 mtr to 29 mtr elevation and atomizing station and roof of feed water line in unit iv boiler
Supply of galvalume sheets of thickness not less than 0.8mm for side coverage at 18 mtr to 29 mtr elevation and atomizing station and roof of feed water line in unit iv boiler
Read moreSupply of galvalume sheets of thickness not less than 0.8mm for providing side coverage to the four sides of boiler structure in unit iv boiler
Supply of galvalume sheets of thickness not less than 0.8mm for providing side coverage to the four sides of boiler structure in unit iv boiler
Read moreSupply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 52 mtr elevation four sides of unit iii boiler
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 52 mtr elevation four sides of unit iii boiler
Read moreTtps mech ii bm unit iii strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2024 2025
Ttps mech ii bm unit iii strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2024 2025
Read moreNctps ii mi circle bm division 600mw unit i boiler rectification of defective tubes in boiler first pass area above 43 mtr elevation
&#x0d nctps ii mi circle bm division 600mw unit i boiler rectification of defective tubes in boiler first pass area above 43 mtr elevation
Read moreof your Industry type