Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0 8mm Conforming To Is14246 For Coverage In 52 Mtr Elevation Near Drum And In Front Of Lift For Unit I Ii And Iii Boiler
|
Description |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0 8mm Conforming To Is14246 For Coverage In 52 Mtr Elevation Near Drum And In Front Of Lift For Unit I Ii And Iii Boiler
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_523013_1 |
Reference Number |
CE/TTPS/4174M |
Tender Fee | 0 |
EMD | 9600 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=622578 |
Start Date | February 05, 2025 21:30 |
End Date |
27/02/2025 ( Expired 55 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of different types of bell crank lever and tie rod assembly for boiler burner tilting mechanism for unit i, ii and iii in boilers
Supply of different types of bell crank lever and tie rod assembly for boiler burner tilting mechanism for unit i, ii and iii in boilers
Read moreDr.nttps-replacement of damaged gci sheets with pre painted trapezoidal profile galvalume roofing sheets for the roof and side cladding of boiler lift shafts of unit -iii.
Dr.nttps-replacement of damaged gci sheets with pre painted trapezoidal profile galvalume roofing sheets for the roof and side cladding of boiler lift shafts of unit -iii.
Read moreSupply of soot blower poppet valve of model wb ie for unit i ii and iii boiler
Supply of soot blower poppet valve of model wb ie for unit i ii and iii boiler
Read moreSupply of spares for burner and pressure parts suitable for unit i ii and iii boiler
Supply of spares for burner and pressure parts suitable for unit i ii and iii boiler
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Ttps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Read moreSupply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Read moreTtps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Ttps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii ahp unit i ii iii breakdown work in ash slurry pump house equipments overhauling of ash slurry pump seal water pump and suction delivery valves for the period from 01 04 2025 to 31 03 2026
Ttps mech ii ahp unit i ii iii breakdown work in ash slurry pump house equipments overhauling of ash slurry pump seal water pump and suction delivery valves for the period from 01 04 2025 to 31 03 2026
Read moreNctps i cm circle cm i periodical cleaning of all drains in bottom ash hopper plant area boiler area and mill area in unit i ii iii and c row drain at power house for the period of one year from 01.04.2025 to 31.03.2026.
Nctps i cm circle cm i periodical cleaning of all drains in bottom ash hopper plant area boiler area and mill area in unit i ii iii and c row drain at power house for the period of one year from 01.04.2025 to 31.03.2026.
Read moreof your Industry type