Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0 8mm Conforming To Is14246 For Coverage In 52 Mtr Elevation Near Drum And In Front Of Lift For Unit I Ii And Iii Boiler
|
Description |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0 8mm Conforming To Is14246 For Coverage In 52 Mtr Elevation Near Drum And In Front Of Lift For Unit I Ii And Iii Boiler
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_523013_1 |
Reference Number |
CE/TTPS/4174M |
Tender Fee | 0 |
EMD | 9600 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=622578 |
Start Date | February 05, 2025 21:30 |
End Date |
27/02/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Read moreSupply of m.s. floor grill and staircase step grill with one coat of red oxide paint for esp airpreheater, id fan pa fan and fd fan platforms in unit i ii and iii
Supply of m.s. floor grill and staircase step grill with one coat of red oxide paint for esp airpreheater, id fan pa fan and fd fan platforms in unit i ii and iii
Read moreSupply of different types of bell crank lever and tie rod assembly for boiler burner tilting mechanism for unit i, ii and iii in boilers
Supply of different types of bell crank lever and tie rod assembly for boiler burner tilting mechanism for unit i, ii and iii in boilers
Read moreDr.nttps-replacement of damaged gci sheets with pre painted trapezoidal profile galvalume roofing sheets for the roof and side cladding of boiler lift shafts of unit -iii.
Dr.nttps-replacement of damaged gci sheets with pre painted trapezoidal profile galvalume roofing sheets for the roof and side cladding of boiler lift shafts of unit -iii.
Read moreSupply of soot blower poppet valve of model wb ie for unit i ii and iii boiler
Supply of soot blower poppet valve of model wb ie for unit i ii and iii boiler
Read moreSupply of spares for burner and pressure parts suitable for unit i ii and iii boiler
Supply of spares for burner and pressure parts suitable for unit i ii and iii boiler
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Ttps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Read moreSupply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Supply of galvalume sheets of thickness not less than 0.8mm conforming to is14246 for coverage in 32 mtr elevation above hot air duct and 52mtr elevation above walk way in unit i ii and iii boiler
Read moreTtps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Ttps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Read moreof your Industry type