Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0.8mm Conforming To Is14246 For Coverage In 52 Mtr Elevation Four Sides Of Unit Iii Boiler
|
Description |
Supply Of Galvalume Sheets Of Thickness Not Less Than 0.8mm Conforming To Is14246 For Coverage In 52 Mtr Elevation Four Sides Of Unit Iii Boiler
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_471560_1 |
Reference Number |
CE/TTPS/4027M |
Tender Fee | 0 |
EMD | 9200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=560247 |
Start Date | August 09, 2024 19:30 |
End Date |
09/09/2024 ( Expired 297 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of spares for burner, stud for wall blower and eco coil plug suitable for unit i, ii and iii boiler
Supply of spares for burner, stud for wall blower and eco coil plug suitable for unit i, ii and iii boiler
Read moreIndependent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Read moreTn-15291 supply of various sizes boiler cds tubes/ pipes for boiler stage i to v, unit 1 to 7 at kspts, kota.
Supply of various sizes boiler cds tubes/ pipes for boiler stage i to v, unit 1 to 7 at kspts, kota.
Read moreProviding labour services for annual maintenance of water supply system and sanitation system of power house building unit 1 to 5, auxiliary building, administrative building, office complex, store shed, canteen building and chp control room in po
Providing labour services for annual maintenance of water supply system and sanitation system of power house building unit 1 to 5, auxiliary building, administrative building, office complex, store shed, canteen building and chp control room in po
Read moreHiring of 2(two) nos of not less than 400tph capacity mobile/semi-mobile crushers for crushing of 60lt pf coal to (-)100 mm size (in all dimensions) including provision, installation of new crushing unit with all infrastructure with feeding , crushing and unloading the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at pkoc(sec-iv),mng area.
Hiring of 2 (two) nos of not less than 400 tph capacity mobile/semi-mobile crushers for crushing of 60 lt of coal to (-) 100 mm size (in all dimensions) including provision, installation of new crushing unit with all infrastructure with feeding, crushing and unloading the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at pkoc (sec-iv), mng area.
Read moreTtps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Read moreSp.137 nctps ii es circle em ii dn boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 2a 2b and 2c at 24 mtr boiler elevation during the aoh period 2025 of unit ii
Sp.137 nctps ii es circle em ii dn boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 2a 2b and 2c at 24 mtr boiler elevation during the aoh period 2025 of unit ii
Read moreProviding water supply arrangements for giripradakshana on 08th 09th of july-2025 from new venkojipalem hanuman temple to satya sai nagar arch via hb colony road (13 stalls) in zone-iii gvmc.
Providing water supply arrangements for giripradakshana on 08th 09th of july-2025 from new venkojipalem hanuman temple to satya sai nagar arch via hb colony road (13 stalls) in zone-iii gvmc.
Read moreProviding water supply arrangements for giripradakshana on 08th 09th of july-2025 from tenneti park to venkojipalem n.h.highway junction sector-i (10 stalls) in zone-iii gvmc.
Providing water supply arrangements for giripradakshana on 08th 09th of july-2025 from tenneti park to venkojipalem n.h.highway junction sector-i (10 stalls) in zone-iii gvmc.
Read moreS.r to mahatma gandhi marg road from pmg square to master canteen square in unit-iii, bhubaneswar such as from ch. 0.000 km. to 0.700 km. such as laying of bituminous concrete at unit-iii bhubaneswar for the year 2025-26.
S.r to mahatma gandhi marg road from pmg square to master canteen square in unit-iii, bhubaneswar such as from ch. 0.000 km. to 0.700 km. such as laying of bituminous concrete at unit-iii bhubaneswar for the year 2025-26.
Read moreof your Industry type