Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mp Rbc Cada Work Urgent Rectification Works To The Cada Channel B/W Ch 0/200km To 0/500km Ing From The Sluice At Ch 19/820km Of Rbmc
|
| Description |
The Provisions Included In This Estimate Are&Amp#X0d
Demolishing Of Concrete, Earthwork Excavation, Cc&Amp#X0d
1 4 8 Using 40 Mm For Bed Foundation,Cc&Amp#X0d
1 3 6 Using 20 Mm B Stone For Side Walls, Cc 1 2 4&Amp#X0d
Using 20 Mm B Stone For Wearing Coat, Rcc In&Amp#X0d
1 1.5 3
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2025_Irrig_759153_2 |
|
Reference Number |
Re-Tender No.08/ET/HW/2021-2022/2 |
| Tender Fee | 1965 |
| EMD | 22303 |
| Tender Value | - |
| Place | Mundur |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1297685 |
| Start Date | August 19, 2025 20:30 |
| End Date |
Expired
26/08/2025
Expired 414 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tripangottur gp pro.no 102/26-27 ramarhalli anolmukku road renovation ch 0/000 to 0/500km in ward no8
Road renovation
Read moreGeneral-deposit work -2026-27-rectification of damaged tractor crossing slab and side wall of ch 0/960 to ch 0/966 km of kambrathchalla branch canal and construction of side protection wall in cada field channel of ch 0/367 to ch 0/388 km that off
Clearing grass demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering plastering etc
Read moreGeneral-psm 2026-27-annual maintenance of pattikkad branch canal from ch.0/000km to 5/200km for the year 2026-27-general civil work
General-psm 2026-27-annual maintenance of pattikkad branch canal from ch.0/000km to 5/200km for the year 2026-27-general civil work
Read moreS/r to deulipada gp to chandiapali road from ch- 0/100km to 0/500km such as filling patch repair in gsb gr-iv material for the year 2026-27.
S/r to deulipada gp to chandiapali road from ch- 0/100km to 0/500km such as filling patch repair in gsb gr-iv material for the year 2026-27.
Read moreGeneral nip action plan 2026 27 dam2614 annual cleaning of rbc during water distribution from ch 0 m to 17000m general civil work
General nip action plan 2026 27 dam2614 annual cleaning of rbc during water distribution from ch 0m to 17000m general civil work
Read moreGps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Gps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Read moreGeneral cpp tms 2026 27 modernization of field channel offtaking from sluice no 39 of nallepilly branch canal bw ch 0 000 km to 0 500 general civil work
Modernization of field channel offtaking from sluice no 39 of nallepilly branch canal bw ch 0 000 km to 0 500
Read moreG e n e r a l - m p - k d r - a p - 2 0 2 6 - 2 7 - maintaining water distribution -2026-27 removal of blockage, garbages and debris for lb main canal from ch 20/200km to 31/600km, all its branches and sub canal-general civil work
Engaging hydraulic excavator, engaging man mazdoor and supplying and stacking earth filled bags
Read moreGeneral-emergency-bund protection for the cada canal ing from 19/820 km of rbmc between ch 0/250 to 0/350 km k
During the heavy rain in july august 2022,&#x0d the right bund of cada channel ing from&#x0d the sluice at chainage 19/820km of rbmc are&#x0d breached in 3 locations and water entered in to&#x0d the paddy field paddy field is flooded
Read moreGeneral-mp-rbc- -2023-24-modernisation of cada field channel-urgent rectification works to cada channel starting from sluice 17/800 km of rbmc-general civil work
The proposed cada was meeting a pipe which is damaged a n d a l w a y s b l o c k e d d u r i n g w a t e r distribution.the proposed cada is along the side of poriyani high way and the area get water logged during water d
Read moreof your Industry type