Tender Details

Particulars Details
Title
Part A Shifting Of 02 Nos.) Pumps Of Capacity 198 Hp 02 Nos. From One Place To Other Place Within The Mine Periphery, Due To Sudden Requirement Of Pumping At Different Location In Mines. Part B Dismantling, Laying, Pipe Cut
Description
Part A Shifting Of 02 Pumps Of Capacity 198 Hp 02 Nos. From One Place To Other Place Within The Mine Periphery, Due To Sudden Requirement Of Pumping At Different Location In Mines. &#X0d Part B Dismantling, Laying, Pipe Cut
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_333296_1
Reference
Number
PE(EnM)/TTK/NIT/2024-25/12 dtd. 26.03.2025
Tender Fee 0
EMD 9266
Tender Value
Place Tetariakhar OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345533
Start Date March 26, 2025 22:30
End Date

05/04/2025 ( Expired 70 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level

Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level

Read more
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year

Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year

Read more
Shifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.

Shifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.

Read more
Part-a shifting of 02 nos.) pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. part-b dismantling, laying, pipe cut

Part-a shifting of 02 pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. &#x0d part-b dismantling, laying, pipe cut

Read more
Shifting of 04 nos. various capacity pumps due to monsoon in rvi of khottadih colliery under pandaveswar area.

Shifting of 04 nos. various capacity pumps due to monsoon in rvi of khottadih colliery under pandaveswar area.

Read more
Erection and dismantling of 3.3kv oh line short span and tapping line in different feeders in mines for day to day work for providing power supply to excavators, drills and pumping for mining operation for a period of one year, bharatpur ocp.

Erection and dismantling of 3.3kv oh line short span and tapping line in different feeders in mines for day to day work for providing power supply to excavators, drills and pumping for mining operation for a period of one year, bharatpur ocp.

Read more
Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh

Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh

Read more
Annual maintenance contractor for the work of erection and dismantling of ht oh line in mines due to advancement of mine for power to hemms and ht pumps as and when required for the period of 730 days at bina project

Annual maintenance contractor for the work of erection and dismantling of ht oh line in mines due to advancement of mine for power to hemms and ht pumps as and when required for the period of 730 days at bina project

Read more
Shifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive

Shifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive

Read more
Part-a) shifting of two number pumps of 1000 gpm, make - kirloskar oil engines itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s

Part-a shifting of two number pumps of 1000 gpm, make - kirloskar oil engines itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise