Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Part A Shifting Of 02 Nos.) Pumps Of Capacity 198 Hp 02 Nos. From One Place To Other Place Within The Mine Periphery, Due To Sudden Requirement Of Pumping At Different Location In Mines. Part B Dismantling, Laying, Pipe Cut
|
Description |
Part A Shifting Of 02 Pumps Of Capacity 198 Hp 02 Nos. From One Place To Other Place Within The Mine Periphery, Due To Sudden Requirement Of Pumping At Different Location In Mines. 
Part B Dismantling, Laying, Pipe Cut
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333296_1 |
Reference Number |
PE(EnM)/TTK/NIT/2024-25/12 dtd. 26.03.2025 |
Tender Fee | 0 |
EMD | 9266 |
Tender Value | |
Place | Tetariakhar OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345533 |
Start Date | March 26, 2025 22:30 |
End Date |
05/04/2025 ( Expired 70 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Read moreShifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreShifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.
Shifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.
Read morePart-a shifting of 02 nos.) pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. part-b dismantling, laying, pipe cut
Part-a shifting of 02 pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. 
 part-b dismantling, laying, pipe cut
Read moreShifting of 04 nos. various capacity pumps due to monsoon in rvi of khottadih colliery under pandaveswar area.
Shifting of 04 nos. various capacity pumps due to monsoon in rvi of khottadih colliery under pandaveswar area.
Read moreErection and dismantling of 3.3kv oh line short span and tapping line in different feeders in mines for day to day work for providing power supply to excavators, drills and pumping for mining operation for a period of one year, bharatpur ocp.
Erection and dismantling of 3.3kv oh line short span and tapping line in different feeders in mines for day to day work for providing power supply to excavators, drills and pumping for mining operation for a period of one year, bharatpur ocp.
Read moreDay to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh
Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh
Read moreAnnual maintenance contractor for the work of erection and dismantling of ht oh line in mines due to advancement of mine for power to hemms and ht pumps as and when required for the period of 730 days at bina project
Annual maintenance contractor for the work of erection and dismantling of ht oh line in mines due to advancement of mine for power to hemms and ht pumps as and when required for the period of 730 days at bina project
Read moreShifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
Shifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
Read morePart-a) shifting of two number pumps of 1000 gpm, make - kirloskar oil engines itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s
Part-a shifting of two number pumps of 1000 gpm, make - kirloskar oil engines itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s
Read moreof your Industry type