Particulars | Details |
---|---|
Title |
Part A Shifting Of 02 Nos.) Pumps Of Capacity 198 Hp 02 Nos. From One Place To Other Place Within The Mine Periphery, Due To Sudden Requirement Of Pumping At Different Location In Mines. Part B Dismantling, Laying, Pipe Cut
|
Description |
Part A Shifting Of 02 Pumps Of Capacity 198 Hp 02 Nos. From One Place To Other Place Within The Mine Periphery, Due To Sudden Requirement Of Pumping At Different Location In Mines. 
Part B Dismantling, Laying, Pipe Cut
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333296_1 |
Reference Number |
PE(EnM)/TTK/NIT/2024-25/12 dtd. 26.03.2025 |
Tender Fee | 0 |
EMD | 9266 |
Tender Value | |
Place | Tetariakhar OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345533 |
Start Date | March 26, 2025 22:30 |
End Date |
05/04/2025 ( Expired 93 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Read moreShifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreShifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc
Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc
Read moreConstruction of 62.5 kl capacity underground reservoir (ugr) for re-use of treated water by 38 mld stp and fitting of 02 nos. 5.0 hp capacity sewage pumps, construction of treated water filling station, pipe fitting, fire hydrant fitti
Construction of 62.5 kl capacity underground reservoir (ugr) for re-use of treated water by 38 mld stp and fitting of 02 nos. 5.0 hp capacity sewage pumps, construction of treated water filling station, pipe fitting, fire hydrant fitti
Read moreShifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.
Shifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read morePart-a shifting of 02 nos.) pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. part-b dismantling, laying, pipe cut
Part-a shifting of 02 pumps of capacity 198 hp- 02 nos. from one place to other place within the mine periphery, due to sudden requirement of pumping at different location in mines. 
 part-b dismantling, laying, pipe cut
Read moreShifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
Shifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
Read morePart-a) shifting of two number pumps of 1000 gpm, make - kirloskar oil engines itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s
Part-a shifting of two number pumps of 1000 gpm, make - kirloskar oil engines itd. from one place to other place with in 50 metre radius, due to decreased water level in sump also dismantling of unused 100 metre pipe line from 28 number coal stock s
Read moreDismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement.
Dismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement
Read moreof your Industry type