Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Transporting, Laying And Jointing Of Pipe Line Box Cut Iii Side Water Supply Pipe Line Of Abocp Mine, Block Ii Area
|
| Description |
Dismantling, Transporting, Laying And Jointing Of Pipe Line Box Cut Iii Side Water Supply Pipe Line Of Abocp Mine, Block Ii Area
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_301752_1 |
|
Reference Number |
GM/B-II/AM (ENM)/E-TENDER/2023-24/343 dt 16.02.24 |
| Tender Fee | 0 |
| EMD | 1400 |
| Tender Value | - |
| Place | ABOCP Mine, Block-II Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312582 |
| Start Date | February 19, 2024 14:30 |
| End Date |
Expired
29/02/2024
Expired 955 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Revenue (endowments-ii) department- godavari pushkaralu-2027-teir-iii-irriagtion department works-repairs of pushkar ghat on right side of river godavari at mullakatta(v), eturunagaram(m), mulugu(dist).
Revenue (endowments-ii) department- godavari pushkaralu-2027-teir-iii-irriagtion department works-repairs of pushkar ghat on right side of river godavari at mullakatta(v), eturunagaram(m), mulugu(dist).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreDi erection and dismantling of 6.6 kv ht o/h lines for box cut-iii abocp mine block-ii area
Di erection and dismantling of 6.6 kv ht o/h lines for box cut-iii abocp mine block-ii area
Read moreDismantling, transporting, laying and jointing of 8in/10in dia pipe at heighwall area to sump at 1t patch abocp mine block-ii area
Dismantling, transporting, laying and jointing of 8in/10in dia pipe at heighwall area to sump at 1t patch abocp mine block-ii area
Read moreWork of dismantling, erection of 6.6kv benidih feeder in fire area box cut-ii abocp mine under block-ii area
Work of dismantling, erection of 6.6kv benidih feeder in fire area box cut-ii abocp mine under block-ii area
Read moreDi, erection and dismantling of 6.6kv benidih feeder advancing of face maa ambey outsourcing patch power supply motor pump box cut-iii and maa ambey feeder breaker of abocp mine
Di, erection and dismantling of 6.6kv benidih feeder advancing of face maa ambey outsourcing patch power supply motor pump box cut-iii and maa ambey feeder breaker of abocp mine
Read moreDismantling of 8in dia/10in dia ms pipe line one and three delivery (old) deco highwell to box-cut iii (apml face cutting zone area) under abocp mine under block-ii area
Dismantling of 8in dia/10in dia ms pipe line one and three delivery (old) deco highwell to box-cut iii (apml face cutting zone area) under abocp mine under block-ii area
Read more(a) di, erection, dismantling, breakdown, repairing of 6.6 kv sf(i) coal face abocp, power supply drill m/c, shovel m/c 4000 gpm pump of abocp (b) breakdown, repairing of 6.6 kv benidih feeder box cut-iii fire area power supply box cut-iii tra
(a) di, erection, dismantling, breakdown, repairing of 6.6 kv sf(i) coal face abocp, power supply drill m/c, shovel m/c 4000 gpm pump of abocp (b) breakdown, repairing of 6.6 kv benidih feeder box cut-iii fire area power supply box cut-iii tra
Read moreof your Industry type