Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Title 1 Air Conditioning System,Title 2 Drg And Doc,Title 3 Inst Material,Title 4 Ser Engg,Title 5
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/5824775 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 15, 2025 23:54 |
End Date |
29/01/2025 ( Expired 163 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreConsultancy services for authority engineer for supervision of widening and improvement of shangshak-tengnoupal road pkg-1 and widening and improvement of shangshak-tengnoupal road pkg-3 of nh-102a into 2 lane with hard shoulder.
Consultancy services for authority engineer for supervision of widening and improvement of shangshak-tengnoupal road pkg-1 and widening and improvement of shangshak-tengnoupal road pkg-3 of nh-102a into 2 lane with hard shoulder.
Read morePrototype 1,prototype 2,prototype 3,prototype 4,prototype 5,prototype 6,prototype 7,prototype 8,pro
Read more
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreElectrical wiring at type -1 type -2 type -3 and type- 4 at different departmental colonies at lucknow
Electrical wiring at type 1 type 2 type 3 and type 4 at different departmental colonies at lucknow
Read moreRepair, maintenance to external electrification system comprising ht oh / ug cables, vcb, transformers 4 pole and 2 pole structures and connected allied works at caw under ge (af) hakimpet
Repair, maintenance to external electrification system comprising ht oh / ug cables, vcb, transformers 4 pole and 2 pole structures and connected allied works at caw under ge (af) hakimpet
Read moreof your Industry type