Tender Details

Particulars Details
Title
Complete Repairing And Overhauling Of C.I. Wheel And Shaft Of Washed Coal Shuttle Conveyor, Washed Coal Power Shuttle Conveyor And Stockpile Shuttle Conveyor In Main Plant At Sawang Washery.
Description
Complete Repairing And Overhauling Of C.I. Wheel And Shaft Of Washed Coal Shuttle Conveyor, Washed Coal Power Shuttle Conveyor And Stockpile Shuttle Conveyor In Main Plant At Sawang Washery.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_319427_1
Reference
Number
SGW/KTA/ENM/E-Tender/24-25/58 Date 18.10.2024
Tender Fee 0
EMD 2800
Tender Value
Place Office of the Project Officer, Sawang Washery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331094

Start Date October 19, 2024 16:30
End Date
Expired 29/10/2024

Expired 605 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration of electrical supply by locating and repairing faults in the underground power cable feeding from substation to crl, including servicing and maintenance of the electrical distribution panel at central reference library (crl), d.u.

Restoration of electrical supply by locating and repairing faults in the underground power cable feeding from substation to crl, including servicing and maintenance of the electrical distribution panel at central reference library (crl),d.u.

Read more
Dismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.

Dismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.

Read more
Overhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.

Overhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.

Read more
Complete repairing and overhauling of clean coal / middling coal shuttles drive wheel, shaft, bearing blocks replacement etc. work in main plant at sawang washery.

Complete repairing and overhauling of clean coal / middling coal shuttles drive wheel, shaft, bearing blocks replacement etc. work in main plant at sawang washery.

Read more
Repairing / replacement and overhauling of clean coal shuttle belt conveyor track rail 30lbs, box clamp, tie rod bolt etc. work in main plant of sawang washery.

Repairing / replacement and overhauling of clean coal shuttle belt conveyor track rail 30lbs, box clamp, tie rod bolt etc. work in main plant of sawang washery.

Read more
Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.

Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.

Read more
Break-up-cum dismantling and repairing and fabrication of c.i. wheel and shaft of both a side shuttle belt conveyors in rcb top of raw coal section of sawang washery.

Break-up-cum dismantling and repairing and fabrication of c.i. wheel and shaft of both a side shuttle belt conveyors in rcb top of raw coal section of sawang washery.

Read more
Repairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main

Repairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main

Read more
Repairing and overhauling of clean coal winch machine, c.i. pulley of clean coal side in loading section of sawang washery.

Repairing and overhauling of clean coal winch machine, c.i. pulley of clean coal side in loading section of sawang washery.

Read more
Repairing and overhauling of pneumatic cylinder complete and replacement of solenoid valve of washed coal power bunker and clean coal bunker gate at loading section of sawang washery.

Repairing and overhauling of pneumatic cylinder complete and replacement of solenoid valve of washed coal power bunker and clean coal bunker gate at loading section of sawang washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise