| Particulars | Details |
|---|---|
| Title |
Complete Repairing And Overhauling Of C.I. Wheel And Shaft Of Washed Coal Shuttle Conveyor, Washed Coal Power Shuttle Conveyor And Stockpile Shuttle Conveyor In Main Plant At Sawang Washery.
|
| Description |
Complete Repairing And Overhauling Of C.I. Wheel And Shaft Of Washed Coal Shuttle Conveyor, Washed Coal Power Shuttle Conveyor And Stockpile Shuttle Conveyor In Main Plant At Sawang Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_319427_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/58 Date 18.10.2024 |
| Tender Fee | 0 |
| EMD | 2800 |
| Tender Value | |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331094 |
| Start Date | October 19, 2024 16:30 |
| End Date |
Expired
29/10/2024
Expired 605 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of electrical supply by locating and repairing faults in the underground power cable feeding from substation to crl, including servicing and maintenance of the electrical distribution panel at central reference library (crl), d.u.
Restoration of electrical supply by locating and repairing faults in the underground power cable feeding from substation to crl, including servicing and maintenance of the electrical distribution panel at central reference library (crl),d.u.
Read moreDismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.
Dismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.
Read moreOverhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Overhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Read moreComplete repairing and overhauling of clean coal / middling coal shuttles drive wheel, shaft, bearing blocks replacement etc. work in main plant at sawang washery.
Complete repairing and overhauling of clean coal / middling coal shuttles drive wheel, shaft, bearing blocks replacement etc. work in main plant at sawang washery.
Read moreRepairing / replacement and overhauling of clean coal shuttle belt conveyor track rail 30lbs, box clamp, tie rod bolt etc. work in main plant of sawang washery.
Repairing / replacement and overhauling of clean coal shuttle belt conveyor track rail 30lbs, box clamp, tie rod bolt etc. work in main plant of sawang washery.
Read moreRepairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Read moreBreak-up-cum dismantling and repairing and fabrication of c.i. wheel and shaft of both a side shuttle belt conveyors in rcb top of raw coal section of sawang washery.
Break-up-cum dismantling and repairing and fabrication of c.i. wheel and shaft of both a side shuttle belt conveyors in rcb top of raw coal section of sawang washery.
Read moreRepairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main
Repairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main
Read moreRepairing and overhauling of clean coal winch machine, c.i. pulley of clean coal side in loading section of sawang washery.
Repairing and overhauling of clean coal winch machine, c.i. pulley of clean coal side in loading section of sawang washery.
Read moreRepairing and overhauling of pneumatic cylinder complete and replacement of solenoid valve of washed coal power bunker and clean coal bunker gate at loading section of sawang washery.
Repairing and overhauling of pneumatic cylinder complete and replacement of solenoid valve of washed coal power bunker and clean coal bunker gate at loading section of sawang washery.