Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Carriage Wheel Shaft 04 Nos. Unit No.118 A Shuttle Conveyor Of Pre Washery Section At Kw.
|
| Description |
Repairing Of Carriage Wheel Shaft 04 Nos. Unit No.118 A Shuttle Conveyor Of Pre Washery Section At Kw.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_325586_1 |
|
Reference Number |
PO/KW/E-TENDER/24-25/96, Date-12.01.2025 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | KEDLA WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337495 |
| Start Date | January 13, 2025 15:30 |
| End Date |
Expired
23/01/2025
Expired 585 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Belt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery
Belt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery
Read moreComplete repairing and overhauling of c.i. wheel and shaft of washed coal shuttle conveyor, washed coal power shuttle conveyor and stockpile shuttle conveyor in main plant at sawang washery.
Complete repairing and overhauling of c.i. wheel and shaft of washed coal shuttle conveyor, washed coal power shuttle conveyor and stockpile shuttle conveyor in main plant at sawang washery.
Read moreDismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.
Dismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.
Read moreOverhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Overhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Read moreRepairing of spure and pinion gear of unit no. 118a shuttle belt conveyor 02 (two) pairs of pre-washery section at kedla washery
Repairing of spure and pinion gear of unit no. 118a shuttle belt conveyor 02 (two) pairs of pre-washery section at kedla washery
Read moreRe-handling of spilled raw coal on the floor of 118aandb shuttle conveyor, under and around the take-up pulley of 116b belt conveyor of pre-washery at kedla washery.
Re-handling of spilled raw coal on the floor of 118aandb shuttle conveyor, under and around the take-up pulley of 116b belt conveyor of pre-washery at kedla washery.
Read moreDeck plate channel changing of 133a belt conveyor of pre-washery section at kedla washery
Deck plate channel changing of 133a belt conveyor of pre-washery section at kedla washery
Read moreRepairing of 04 nos. er mass, dead weight with shaft of vibrating screen unit no. 111a1a2 of pre-washery at kedla washery.
Repairing of 04 nos. er mass, dead weight with shaft of vibrating screen unit no. 111a1a2 of pre-washery at kedla washery.
Read moreof your Industry type