Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing / Replacement And Overhauling Of Clean Coal Shuttle Belt Conveyor Track Rail 30lbs, Box Clamp, Tie Rod Bolt Etc. Work In Main Plant Of Sawang Washery.
|
| Description |
Repairing / Replacement And Overhauling Of Clean Coal Shuttle Belt Conveyor Track Rail 30lbs, Box Clamp, Tie Rod Bolt Etc. Work In Main Plant Of Sawang Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_328657_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/85 Date 11.02.2025 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340665 |
| Start Date | February 12, 2025 16:30 |
| End Date |
Expired
21/02/2025
Expired 574 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing/replacement of a and b shuttle conveyor track rail, box clamp and repairing of different sizes of sprockets in pch section at sawang washery.
Repairing/replacement of a and b shuttle conveyor track rail, box clamp and repairing of different sizes of sprockets in pch section at sawang washery.
Read moreComplete repairing and overhauling of c.i. wheel and shaft of washed coal shuttle conveyor, washed coal power shuttle conveyor and stockpile shuttle conveyor in main plant at sawang washery.
Complete repairing and overhauling of c.i. wheel and shaft of washed coal shuttle conveyor, washed coal power shuttle conveyor and stockpile shuttle conveyor in main plant at sawang washery.
Read moreRail clamp (type-i) ; f/cc track,rail clamp (type-ii) ; f/cc track,rail clamp; f/cp track,rail clam
Read more
Rail clamp (type-i) ; f/cc track,rail clamp (type-ii) ; f/cc track,rail clamp; f/cp track,rail clam
Read more
Dismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.
Dismantling, fabrication, repairing of 05 pairs c.i. wheel including shaft of stockpile shuttle conveyor in main plant at sawang washery.
Read moreRepairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Read moreRepairing and overhauling of clean coal winch machine, c.i. pulley of clean coal side in loading section of sawang washery.
Repairing and overhauling of clean coal winch machine, c.i. pulley of clean coal side in loading section of sawang washery.
Read moreOverhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Overhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Read moreBelt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery
Belt changing of unit no. 133a belt conveyor and derailed carriage re-installation of shuttle conveyor 118b of pre-washery at kedla washery
Read moreof your Industry type