Tender Details
Particulars | Details |
---|---|
Title |
Repairing / Replacement And Overhauling Of Clean Coal Shuttle Belt Conveyor Track Rail 30lbs, Box Clamp, Tie Rod Bolt Etc. Work In Main Plant Of Sawang Washery.
|
Description |
Repairing / Replacement And Overhauling Of Clean Coal Shuttle Belt Conveyor Track Rail 30lbs, Box Clamp, Tie Rod Bolt Etc. Work In Main Plant Of Sawang Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_328657_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/85 Date 11.02.2025 |
Tender Fee | 0 |
EMD | 2600 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340665 |
Start Date | February 12, 2025 16:30 |
End Date |
21/02/2025 ( Expired 58 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of complete repairing, overhauling and replacement of impeller of single stage horizontal spindle volute type main pumpno. 203 at saltpan pumping station.
Work of complete repairing, overhauling and replacement of impeller of single stage horizontal spindle volute type main pumpno. 203 at saltpan pumping station.
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreRepairing of water line system, both side rear suspension, both side tie rod, axle rod and rear suspension bush hole and replacement of 12 nos bush and removal of 20 nos stud bolt of both rear tyre of ws-28-ii 28054 of kdh project, nk area.
Repairing of water line system, both side rear suspension, both side tie rod, axle rod and rear suspension bush hole and replacement of 12 nos bush and removal of 20 nos stud bolt of both rear tyre of ws-28-ii 28054 of kdh project, nk area.
Read moreRepairing and fitment of bushes of rod assy tie rod assy a frame, cracked dump body, engine guard, transmission guard, railing, cabin, platform, battery box and radiator cover and fixing of asbestos tape in exhaust silencer bh60 3676 of dakra ocp.
Repairing and fitment of bushes of rod assy tie rod assy a frame, cracked dump body, engine guard, transmission guard, railing, cabin, platform, battery box and radiator cover and fixing of asbestos tape in exhaust silencer bh60 3676 of dakra ocp.
Read moreRemoval and clearing of loose and jammed coal lumps, fines etc spilled f/b and belt conveyor accumulated in and around conveyor structure of f/b at kessurgarh under abocp mine of block - ii area
Removal and clearing of loose and jammed coal lumps, fines etc spilled f/b and belt conveyor accumulated in and around conveyor structure of f/b at kessurgarh under abocp mine of block - ii area
Read moreMaking and fitting of er weight assembly in unit 504, 502 and 704 conveyor belt under section-v at moonidih coal washery
Making and fitting of er weight assembly in unit 504, 502 and 704 conveyor belt under section-v at moonidih coal washery
Read moreRepairing and maintenance of lt and ht o/h line for power supply to weighbridge at near nkssy coal dump and l,t o/h line at k.k.c main siding and other miscellaneous work etc. at abocp mine under block-ii area
Repairing and maintenance of lt and ht o/h line for power supply to weighbridge at near nkssy coal dump and l,t o/h line at k.k.c main siding and other miscellaneous work etc. at abocp mine under block-ii area
Read moreCork sheet changing, oil filtration etc. and replacement of av alarm along with oti wii of 1000kva 6.6kv550v transformer sl.no.c6520/82 sbc(ii)repairing 02 nos transformer(a)1mva 11kv/6.6kv(b) 1mva,11kv/3.3kv with fitting box in 6.6kv/3.3kv incoming
Cork sheet changing, oil filtration etc. and replacement of av alarm along with oti wii of 1000kva 6.6kv550v transformer sl.no.c6520/82 sbc(ii)repairing 02 nos transformer(a)1mva 11kv/6.6kv(b) 1mva,11kv/3.3kv with fitting box in 6.6kv/3.3kv incoming
Read moreA)dismantling, fitting, repairing and overhauling of u-1400 radicon gear box of new bunkers washed coal repairing and burnt motor replacement and new motor fitting in rlb section of kathara washery b)i) repairing and thorough overhauling of gear box
A)dismantling, fitting, repairing and overhauling of u-1400 radicon gear box of new bunkers washed coal repairing and burnt motor replacement and new motor fitting in rlb section of kathara washery b)i) repairing and thorough overhauling of gear box
Read moreRepairing/ replacement of water spray system and their pipelines at different coal transfer points of raw coal section of belt conveyor unit 401, 402, 403-a and 403-b at moonidih coal washery.
Repairing/ replacement of water spray system and their pipelines at different coal transfer points of raw coal section of belt conveyor unit 401, 402, 403-a and 403-b at moonidih coal washery.
Read moreof your Industry type