Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Road And Drain From H/O Vivek Mishra To H/O Rajaneesh Via H/O Dheeraj Yadav And H/O Jitendra Singh To H/O Omprakash At Durga Nagar In Ward 87 Under Zone 3.
|
Description |
Improvement Of Road And Drain From H/O Vivek Mishra To H/O Rajaneesh Via H/O Dheeraj Yadav And H/O Jitendra Singh To H/O Omprakash At Durga Nagar In Ward 87 Under Zone 3.
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id | 2025_NNKAN_1021404_1 |
Reference Number |
938/AA-2/24-25 |
Tender Fee | 1180 |
EMD | 52295 |
Tender Value | |
Place | ZONE-2 |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1843279 |
Start Date | March 24, 2025 14:30 |
End Date |
29/03/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreCc road and drain contruction from bhaiyalal kusahwah to manoj kushwah, ward no 1 at nagar parisad badarwas district shivpuri
Cc road and drain contruction from bhaiyalal kusahwah to manoj kushwah, ward no 1 at nagar parisad badarwas district shivpuri
Read moreZone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Zone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Read more(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.
(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreName of work construction of drain and cement concrete road from lokendra house to sachin house on maruti city road in ward no. 23 kahrai.
Name of work construction of drain and cement concrete road from lokendra house to sachin house on maruti city road in ward no. 23 kahrai.
Read moreConstruction work of drain and cc road from vijay verma house to mata mandir in ward-55 pilakhar nagla bihari
Construction work of drain and cc road from vijay verma house to mata mandir in ward-55 pilakhar nagla bihari
Read moreDrain and interlocking construction work in ward 42 bodla road dahtora mod sohan to rakesh, mandir to manish, mandir wali gali, vijay to sohan, vimal to manoj, ramveer to mandir, verma to a.p. singh and shankar lal murti walo to kushwah house.
Drain and interlocking construction work in ward 42 bodla road dahtora mod sohan to rakesh, mandir to manish, mandir wali gali, vijay to sohan, vimal to manoj, ramveer to mandir, verma to a.p. singh and shankar lal murti walo to kushwah house.
Read moreof your Industry type