Tender Details
Particulars | Details |
---|---|
Title |
Renewal Work Of Ramsi Nagla To Khetal Nagla Via Buddhinagla Remaining Part Km. 1(840) Under Dataganj Vidhansabha In District Budaun Fy 2024 25
|
Description |
Renewal Work Of Ramsi Nagla To Khetal Nagla Via Buddhinagla Remaining Part Km. 1(840) Under Dataganj Vidhansabha In District Budaun Fy 2024 25
|
Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
Tender Id | 2025_CEBLY_989686_1 |
Reference Number |
2827(30)/Nivida/2024 Date 21-12-2024 |
Tender Fee | 856 |
EMD | 86000 |
Tender Value | |
Place | Budaun |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1746949 |
Start Date | January 04, 2025 14:30 |
End Date |
15/01/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreDevelop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Develop of 4lane ac sirhind sehna sec of nh205ag delhi amritsar highway nh44 near vill sirhind ch.27.370 to junc with dak expressway ne5 near malerkotla ch.79.200 total l51.83 km pkgi as a part of mohali barnala ic in punjab under nh o on ham
Read moreAAAAAAAAAA
Login to viewRahimpur rajbalhat tarar more road from 0.000 km to 8.360 km, excluding 3.7 km to 4.0 km, strengthening work under hooghly highway division no.- i, in the district of hooghly
Read moreWbpwd/pw(r)/se/shc/nit no 05 of 2025-2026(sl-02)
Permanent protection work of breached portions during flood 2024 from km 3.540 to km 3.600 and km 3.615 to km 3.950 of singti-pancharul road under howrah highway division in the district of howrah.
Read moreGopiballavpur nayagram road from 35.00 km to 41.60km
Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.
Read moreof your Industry type