Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚇 Procurement Opportunity: Design, Manufacture, Supply, Installation, Testing, And Commissioning Of Psd For Mumbai Metro Line 9 🛠️🚇 The Mumbai Metropolitan Region Development Authority (Mmrda), A State Government Undertaking, Invites Bids For The Comprehensive Design, Manufacturing, Supply, Installation, Testing, And Commissioning Of The Power Supply Department (Psd) For The Upcoming Mumbai Metro Line 9, From Dahisar To Morva And 7 A Airport Colony, Csmia. 📅 Bid Submission Deadline: April 26, 2024, 2:00 Pm Tender Fee: Inr 5900 Emd: Inr 10 Million This Project Includes A 2 Year Period Of Defect Liability (Dnmp) Followed By An Additional 3 Year Period Of Commissioning And Maintenance (Cm). Interested Bidders Must Demonstrate Expertise In Metro Rail Systems And Provide A Detailed Proposal That Meets The Technical And Financial Requirements Of The Project. Keywords: Mumbai Metropolitan Region Development Authority, Mumbai Metro Line 9, Power Supply Department, Psd, Design, Manufacture, Supply, Installation, Testing, Commissioning, Dnmp, Cm, Tender, Bid, Mira Bhayander| Particulars | Details |
|---|---|
| Title |
Design Manuf. Supply Inst. Int. Testing And Comm. Of Psd For Line 9 Dahisar To Morva And 7 A Airport Colony Csmia Incl. 2 Years Of Dnmp And E And M L And E And Cmv For Line 9 Dahisar To Scbs Incl. 3 Yr Of Cm After 2 Years Of Dnmp
|
| Description |
Design Manuf. Supply Inst. Int. Testing And Comm. Of Psd For Line 9 Dahisar To Morva And 7 A Airport Colony Csmia Incl. 2 Years Of Dnmp And E And M L And E And Cmv For Line 9 Dahisar To Scbs Incl. 3 Yr Of Cm After 2 Years Of Dnmp
|
| Organisation | Mumbai Metropolitan Region Development Authority | State Govt. and UT |
| Tender Id | 2024_MMRDA_999486_1 |
|
Reference Number |
MMRDA/ML9And7A/MMRP/CA245 |
| Tender Fee | 5900 |
| EMD | 10 Lakh |
| Tender Value | |
| Place | Mira Bhayander |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1746731 |
| Start Date | February 08, 2024 20:30 |
| End Date |
Expired
18/07/2024
Expired 712 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design manufacture supply installation integration testing and commissioning of automatic fare collection systems for line 9 dahisar to morva and 7a airport colony to csmia of mmrp of mmrda including 2 years of dnmp
Design manufacture supply installation integration testing and commissioning of automatic fare collection systems for line 9 dahisar to morva and 7a airport colony to csmia of mmrp of mmrda including 2 years of dnmp
Read moreDesign, manufacture, supply, installation, testing, and commissioning of telecommunication system (except tetra system) for line 9
Design, manufacture, supply, installation, testing, and commissioning of telecommunication system (except tetra system) for line 9 (dahisar east to rai) and line 7a (andheri east to csmia) corridors of mumbai metro including dongri depot
Read moreDesign, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreDesign, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from
 dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreDesign manufacturing supply installation integration testing and commissioning of tvs and ecs for csmia underground section of line 7a of mumbai metro rail project of mmrda including 3 years of comprehensive maintenance after 2 years of dnmp
Design manufacturing supply installation integration testing and commissioning of tvs and ecs for csmia underground section of line 7a of mumbai metro rail project of mmrda including 3 years of comprehensive maintenance after 2 years of dnmp
Read moreDesign, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreDesign, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system)
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot
Read moreDesign manufacture supply installation integration testing and commissioning of power supply and traction e and m and l and e incl 5 yrs of cm after 2 yrs of dlmp for mml 4 and 4a of mmrp of mmrda
Design manufacture supply installation integration testing and commissioning of power supply and traction e and m and l and e incl 5 yrs of cm after 2 yrs of dlmp for mml 4 and 4a of mmrp of mmrda
Read moreDesign manufacture supply installation integration testing and commissioning of rolling stock cbtc telecom psd systems depot mp including 15 years of comprehensive maintainence after 2 years of dlmp of line 6 ssn to vikhroli eeh
Design manufacture supply installation integration testing and commissioning of rolling stock cbtc telecom psd systems depot mp including 15 years of comprehensive maintainence after 2 years of dlmp of line 6 ssn to vikhroli eeh
Read moreDesign manufacture supply installation integration testing and commissioning of pst e and m and l n e incl 15 yrs of cmp after 2 yrs of dlmp for mml 4 and 4a wadala_ kasarvadavali_gaimukh of mmrp of mmrda
Design manufacture supply installation integration testing and commissioning of pst e and m and l n e incl 15 yrs of cmp after 2 yrs of dlmp for mml 4 and 4a wadala_ kasarvadavali_gaimukh of mmrp of mmrda
Read moreof your Industry type