Tender Details

About Tender

🚀 Invitation For Bid: Automatic Fare Collection Systems For Mumbai Metro 🚇💳 The Mumbai Metropolitan Region Development Authority (Mmrda), A State Government Undertaking, Invites Bids For The Design, Manufacture, Supply, Installation, Integration, Testing, And Commissioning Of An Automatic Fare Collection (Afc) System For The Upcoming Line 9 (Dahisar To Morva) And The Extension Of Line 7 A (Airport Colony To Csmia) Under The Mumbai Metro Rail Project (Mmrp). 📅 Bid Submission Deadline: May 28, 2024, 2:00 Pm Tender Fee: Inr 3540 Emd: Inr 10 Million This Project Includes A Comprehensive Solution With A 2 Year Post Commissioning Support And Maintenance Period. Interested Bidders Must Demonstrate Their Capability To Deliver A Robust, Scalable, And Reliable Afc System That Meets The Stringent Requirements Of The Mmrda. Keywords: Mumbai Metropolitan Region Development Authority, Automatic Fare Collection Systems, Metro Rail Project, Afc System, Bid, Mumbai Metro, State Government Undertaking, Tender, Emd
Particulars Details
Title
Design Manufacture Supply Installation Integration Testing And Commissioning Of Automatic Fare Collection Systems For Line 9 Dahisar To Morva And 7 A Airport Colony To Csmia Of Mmrp Of Mmrda Including 2 Years Of Dnmp
Description
Design Manufacture Supply Installation Integration Testing And Commissioning Of Automatic Fare Collection Systems For Line 9 Dahisar To Morva And 7 A Airport Colony To Csmia Of Mmrp Of Mmrda Including 2 Years Of Dnmp
Organisation Mumbai Metropolitan Region Development Authority | State Govt. and UT
Tender Id 2024_MMRDA_1037851_1
Reference
Number
CA 252
Tender Fee 3540
EMD 10 Lakh
Tender Value
Place MUMBAI
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1814741

Start Date March 20, 2024 20:30
End Date
Expired 29/07/2024

Expired 701 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design, manufacture, supply, testing, and commissioning of 90 no. of standard gauge cars for inderlok-indraprastha corridor (line-8 extension) of dmrc including training of employers manpower and 35 years camc for these 90 no. standard gauge cars.

Design, manufacture, supply, testing, and commissioning of 90 no. of standard gauge cars for inderlok-indraprastha corridor (line-8 extension) of dmrc including training of employers manpower and 35 years camc for these 90 no. standard gauge cars.

Read more
Survey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years

Survey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years

Read more
Design, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches sprinkling system and automation using of self dynamic hydro control val

Design, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches &#x0d sprinkling system and automation using of self dynamic hydro control val

Read more
Design, manufacture, supply, installation, testing, and commissioning of telecommunication system (except tetra system) for line 9

Design, manufacture, supply, installation, testing, and commissioning of telecommunication system (except tetra system) for line 9 (dahisar east to rai) and line 7a (andheri east to csmia) corridors of mumbai metro including dongri depot

Read more
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system)

Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot

Read more
Design manuf. supply inst. int. testing and comm. of psd for line 9 dahisar to morva and 7a airport colony csmia incl. 2 years of dnmp and e and m l and e and cmv for line 9 dahisar to scbs incl. 3 yr of cm after 2 years of dnmp

Design manuf. supply inst. int. testing and comm. of psd for line 9 dahisar to morva and 7a airport colony csmia incl. 2 years of dnmp and e and m l and e and cmv for line 9 dahisar to scbs incl. 3 yr of cm after 2 years of dnmp

Read more
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.

Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.

Read more
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot

Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from&#x0d dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.

Read more
Design manufacture supply installation integration testing and commissioning of automatic fare collection system including 15 years of comprehensive maintenance after 2 years of dlmp for mml 6 ssn to vkh eeh of mumbai metro rail project of mmrda

Design manufacture supply installation integration testing and commissioning of automatic fare collection system including 15 years of comprehensive maintenance after 2 years of dlmp for mml 6 ssn to vkh eeh of mumbai metro rail project of mmrda

Read more
Design manufacturing supply installation integration testing and commissioning of tvs and ecs for csmia underground section of line 7a of mumbai metro rail project of mmrda including 3 years of comprehensive maintenance after 2 years of dnmp

Design manufacturing supply installation integration testing and commissioning of tvs and ecs for csmia underground section of line 7a of mumbai metro rail project of mmrda including 3 years of comprehensive maintenance after 2 years of dnmp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise