Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Manufacture, Supply, Installation, Testing And Commissioning Of Radio System Of Line 9 (From Dahisar East To Rai) And 7 A(andheri East To Csmia) Corridor Of Mumbai Metro Including Dongri Depot
|
| Description |
Design, Manufacture, Supply, Installation, Testing And Commissioning Of Radio System Of Line 9 (From
Dahisar East To Rai) And 7 A(andheri East To Csmia) Corridor Of Mumbai Metro Including Dongri Depot.
|
| Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_DMRC_864748_1 |
|
Reference Number |
MS-06R |
| Tender Fee | 23600 |
| EMD | 19.52 Lakh |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=909119 |
| Start Date | July 12, 2025 16:30 |
| End Date |
Expired
18/08/2025
Expired 383 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreDesign, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreDesign manufacture supply installation integration testing and commissioning of automatic fare collection systems for line 9 dahisar to morva and 7a airport colony to csmia of mmrp of mmrda including 2 years of dnmp
Design manufacture supply installation integration testing and commissioning of automatic fare collection systems for line 9 dahisar to morva and 7a airport colony to csmia of mmrp of mmrda including 2 years of dnmp
Read moreDesign manufacture supply installation testing and commissioning of heavy duty machine room less lifts for cmrl phase ii corridor 3 and corridor 5
Corridor 3 (from madhavaram milk colony metro to sholinganallur metro) and corridor 5 (from madhavaram depot metro to koyambedu metro stations including madhavaram depot)
Read moreImprovement of pathways and drainage system at, vikram chawl moolgaon dongri, beat no.81 andheri east, mumbai
Improvement of pathways and drainage system at, vikram chawl moolgaon dongri, beat no.81 andheri east, mumbai
Read moreImprovement of pathways and drainage system at, kusum chawl moolgaon dongri, beat no.81 andheri east, mumbai
Improvement of pathways and drainage system at, kusum chawl moolgaon dongri, beat no.81 andheri east, mumbai
Read moreDetailed topographical survey of east-west corridor (charbagh to vasantkunj) including depot
Detailed topographical survey of east-west corridor (charbagh to vasantkunj) including depot at hardoi road and alignment design of main line and depot entry-exit line for lucknow metro rail project phase 1b.
Read moreImporvement of pathways and drainage system at, sawant chawl, malpa dongri no.3, beat no.81 andheri east, mumbai
Imporvement of pathways and drainage system at, sawant chawl, malpa dongri no.3, beat no.81 andheri east, mumbai
Read moreDesign manufacture supply installation testing and commissioning of platform screen doors for corridor 3 (madhavaram depot to tharamani metro) and corridor 5 (kolathur junction metro to villivakkam mth road metro) of cmrl phase ii
Design manufacture supply installation testing and commissioning of platform screen doors for corridor 3 (madhavaram depot to tharamani metro) and corridor 5 (kolathur junction metro to villivakkam mth road metro) of cmrl phase ii
Read moreImprovement of pathways and drainage system at baba seth chawl, mulgaon dongri, in beat no 81 andheri east k/e ward mumbai.
Improvement of pathways and drainage system at baba seth chawl, mulgaon dongri, in beat no 81 andheri east k/e ward mumbai.
Read moreof your Industry type