Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Detailed Topographical Survey Of East West Corridor (Charbagh To Vasantkunj) Including Depot
|
Description |
Detailed Topographical Survey Of East West Corridor (Charbagh To Vasantkunj) Including Depot At Hardoi Road And Alignment Design Of Main Line And Depot Entry Exit Line For Lucknow Metro Rail Project Phase 1 B.
|
Organisation | Uttar Pradesh Metro Rail Corporation Limited | Public Sector Undertakings |
Tender Id | 2024_UPMRC_202467_1 |
Reference Number |
LKTS-01 |
Tender Fee | 5900 |
EMD | 48700 |
Tender Value | |
Place | LUCKNOW |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=221490 |
Start Date | August 20, 2024 16:30 |
End Date |
27/08/2024 ( Expired 313 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying and stacking of 65 mm machine crushed ballast at karjat depot under aden (n) lnl.
For complete deion and other details, please refer to tender
Read moreSitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreConst. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)
Const. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreCa no.cwe bly/ge (e)/33 of 2025- 2026special repairs to bldg no p-65, p-66 and p-12 (01 to 08) of 116 engr regt under ge (east) bareilly
Ca no.cwe bly/ge (e)/33 of 2025- 2026special repairs to bldg no p-65, p-66 and p-12 (01 to 08) of 116 engr regt under ge (east) bareilly
Read moreProvision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam
Provision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam
Read moreof your Industry type