Tender Details
Particulars | Details |
---|---|
Title |
Detailed Topographical Survey Of East West Corridor (Charbagh To Vasantkunj) Including Depot
|
Description |
Detailed Topographical Survey Of East West Corridor (Charbagh To Vasantkunj) Including Depot At Hardoi Road And Alignment Design Of Main Line And Depot Entry Exit Line For Lucknow Metro Rail Project Phase 1 B.
|
Organisation | Uttar Pradesh Metro Rail Corporation Limited | Public Sector Undertakings |
Tender Id | 2024_UPMRC_202467_1 |
Reference Number |
LKTS-01 |
Tender Fee | 5900 |
EMD | 48700 |
Tender Value | |
Place | LUCKNOW |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=221490 |
Start Date | August 20, 2024 16:30 |
End Date |
27/08/2024 ( Expired 260 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreCs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Cs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Read moreConstruction of technical buildings and allied infrastructure under ge (p) nagrota
Construction of technical buildings and allied infrastructure under ge (p) nagrota
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreMaintenance and special repair work of fire-rated doors and accessories in station premises and cross passage doors of airport express line (new delhi to yashobhumi metro station including ael depot) , dwarka subcity (dwarka mor to dwarka...
Maintenance and special repair work of fire-rated doors and accessories in station premises and cross passage doors of airport express line (new delhi to yashobhumi metro station including ael depot) , dwarka subcity (dwarka mor to dwarka...
Read moreConstruction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Read moreConsultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Consultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Read moreIe services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Ie services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Read moreof your Industry type