| Particulars | Details |
|---|---|
| Title |
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
|
| Description |
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,
Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_319331_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et/70dt 18.10.24 |
| Tender Fee | 0 |
| EMD | 13300 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330983 |
| Start Date | October 21, 2024 23:30 |
| End Date |
Expired
30/10/2024
Expired 671 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreDismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreRepairing of rotor shaft, end cover and dismantling and assembling of the bearings of induction motors of rajrappa washery.
Repairing of rotor shaft, end cover and dismantling and assembling of the bearings of induction motors of rajrappa washery.
Read moreDismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Read moreDismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery
Dismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery
Read moreDismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project
Dismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project
Read moreAmc of one year (365 days) for the work of dismantling, shifting, erection n alignment of motors of different circuit section) of electrical section of rajrappa washery project.
Amc of one year (365 days) for the work of
 dismantling, shifting, erection n alignment of motors of different circuit
 (section) of electrical section of rajrappa washery project.
Read moreDismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
 