Title
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
Description
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,&#X0d Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_319331_1
Reference
Number
GM(R)/SO(W)/Rjp/24-25/Et/70dt 18.10.24
Tender Fee 0
EMD 13300
Tender Value
Place RAJRAPPA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330983

Start Date October 21, 2024 23:30
End Date
Expired 30/10/2024

Expired 589 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Read more
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Read more
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Read more
Amc of one year (365 days) for the work of dismantling, shifting, erection n alignment of motors of different circuit section) of electrical section of rajrappa washery project.

Amc of one year (365 days) for the work of&#x0d dismantling, shifting, erection n alignment of motors of different circuit&#x0d (section) of electrical section of rajrappa washery project.

Read more
Shifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery

Shifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery

Read more
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project

Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.

Read more
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.

Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.

Read more
Dismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project

Dismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project

Read more
Providing, dismantling, repairing, fabrication, erection n alignment of stair, platform handrailing, steel lader railing, from ground to 26 mtr level, jig side of ps5 building, ps6 n ps14 water reservoir stair at rajrappa washery

Providing, dismantling, repairing, fabrication, erection n alignment of stair, platform handrailing, steel lader railing, from ground to 26 mtr level, jig side of ps5 building, ps6 n ps14 water reservoir stair at rajrappa washery

Read more
Dismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project

Dismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project

Read more