Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
|
| Description |
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,
Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_319331_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et/70dt 18.10.24 |
| Tender Fee | 0 |
| EMD | 13300 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330983 |
| Start Date | October 21, 2024 23:30 |
| End Date |
Expired
30/10/2024
Expired 714 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Requirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh
Requirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh
Read moreTtps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Ttps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Read moreShifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreDismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreRepairing of rotor shaft, end cover and dismantling and assembling of the bearings of induction motors of rajrappa washery.
Repairing of rotor shaft, end cover and dismantling and assembling of the bearings of induction motors of rajrappa washery.
Read moreof your Industry type