Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
|
| Description |
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,
Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_319331_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et/70dt 18.10.24 |
| Tender Fee | 0 |
| EMD | 13300 |
| Tender Value | |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330983 |
| Start Date | October 21, 2024 23:30 |
| End Date |
Expired
30/10/2024
Expired 589 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreAmc of one year (365 days) for the work of dismantling, shifting, erection n alignment of motors of different circuit section) of electrical section of rajrappa washery project.
Amc of one year (365 days) for the work of
 dismantling, shifting, erection n alignment of motors of different circuit
 (section) of electrical section of rajrappa washery project.
Read moreShifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery
Shifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery
Read moreDismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.
Read moreDismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Read moreDismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project
Dismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project
Read moreProviding, dismantling, repairing, fabrication, erection n alignment of stair, platform handrailing, steel lader railing, from ground to 26 mtr level, jig side of ps5 building, ps6 n ps14 water reservoir stair at rajrappa washery
Providing, dismantling, repairing, fabrication, erection n alignment of stair, platform handrailing, steel lader railing, from ground to 26 mtr level, jig side of ps5 building, ps6 n ps14 water reservoir stair at rajrappa washery
Read moreDismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project
Dismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project
Read moreof your Industry type