Tender Details

Particulars Details
Title
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
Description
Dismantling, Overhauling, Repairing, Assembling, Erection, Alignment,&#X0d Testing Of Re Circulation N Fresh Water 18 Nos Pumps Installed Different Unit At Pump Section Of Rajrappa Washery Project.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_319331_1
Reference
Number
GM(R)/SO(W)/Rjp/24-25/Et/70dt 18.10.24
Tender Fee 0
EMD 13300
Tender Value -
Place RAJRAPPA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330983

Start Date October 21, 2024 23:30
End Date
Expired 30/10/2024

Expired 714 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Requirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh

Requirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh

Read more
Ttps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul

Ttps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul

Read more
Shifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,

(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn

Read more
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Read more
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project

Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.

Read more
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Read more
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Read more
Repairing of rotor shaft, end cover and dismantling and assembling of the bearings of induction motors of rajrappa washery.

Repairing of rotor shaft, end cover and dismantling and assembling of the bearings of induction motors of rajrappa washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise