Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Amc Of One Year (365 Days) For The Work Of Dismantling, Shifting, Erection N Alignment Of Motors Of Different Circuit Section) Of Electrical Section Of Rajrappa Washery Project.
|
| Description |
Amc Of One Year (365 Days) For The Work Of
Dismantling, Shifting, Erection N Alignment Of Motors Of Different Circuit
(Section) Of Electrical Section Of Rajrappa Washery Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_319825_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et/75dt 26.10.24 |
| Tender Fee | 0 |
| EMD | 9500 |
| Tender Value | |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331517 |
| Start Date | October 28, 2024 23:30 |
| End Date |
Expired
07/11/2024
Expired 590 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplying contract jeep having capacity above 1500cc with driver for a period of one year for the use of electrical section amboori under electrical division kattakada
Supplying contract jeep having capacity above 1500cc with driver for a period of one year for the use of electrical section amboori under electrical division kattakada
Read moreComprehensive prive and corrective maintenance and operation contract of different type ac machines installed at different places at the vivekananda yuba bharati krirangan salt lake kolkata 106 for 01 (one) year
Comprehensive prive and corrective maintenance and operation contract of different type ac machines installed at different places at the vivekananda yuba bharati krirangan salt lake kolkata 106 for 01 (one) year
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,
 testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read moreShifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery
Shifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery
Read moreDismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Read moreShifting erection testing commissioning of different sizes of ms pipes in different places of rajrappa washery.
Shifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery.
Read moreDismantling fabrication erection n alignment of existing cable trench with providing and fixing in the gallery of 301 b c 401 b c ps 3 ps 1 2 and ps 4 electrical section of rajrappa washery project
Dismantling fabrication erection n alignment of existing cable trench with providing and fixing in the gallery of 301 b c 401 b c ps 3 ps 1 2 and ps 4 electrical section of rajrappa washery project
Read moreof your Industry type