Tender Details
Particulars | Details |
---|---|
Title |
Brick Work Side Wall Including Labor Charges,Flooring Work 3 Pcc Base With 124 Ratio Of Cement Cham
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 30, 2025 18:32 |
End Date |
20/06/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
8420/e8 maint and repair/replacement to brick work, plastering work, pcc flooring, ceiling, tiling of wall/flooring, roof treatment, joinery, sanitary and plumbing works incl internal elect of offrs accn under ge (east) bareilly
8420/e8 maint and repair/replacement to brick work, plastering work, pcc flooring, ceiling, tiling of wall/flooring, roof treatment, joinery, sanitary and plumbing works incl internal elect of offrs accn under ge (east) bareilly
Read moreBrick work side wall including labor charges,flooring work 3 pcc base with 124 ratio of cement cham
Read more
(a) repair of tin shed roof flooring side wall sheet
(a) repair of tin shed roof flooring side wall sheet&#x0d tin shed camps&#x0d 1. chikhaldag (nanakbaydi)&#x0d 2. kadmal&#x0d 3. nisarpur&#x0d (b) crusher stone dust work on passages of tin sheds and other incidental works as required. supply of following material includ
Read moreFor the boundary wall of gardens etc. located in various wards of the city, the work of digging 2x2 pits and burying 6 feet long cement poles with cc is to be done
For the boundary wall of gardens etc. located in various wards of the city, the work of digging 2x2 pits and burying 6 feet long cement poles with cc is to be done
Read moreRepair/renovation to various residential buildings under division no.iii shimla.-3. (sh - repair of ceiling and flooring of no. 5and7 steel work in roofing and replacement of old cgi sheets with new prepainted sheets,
Repair/renovation to various residential buildings under&#x0d division no.iii shimla.-3. (sh - repair of ceiling and flooring of no. 5and7 steel&#x0d work in roofing and replacement of old cgi sheets with new prepainted sheets,&#x0d &#x0d
Read moreConstruction of rcc and pcc retaining wall of motorable road footpath side drain flooring ing from raju pan shop to vimal tirkey azad ali house at nariyal bagicha in ward no 11
Construction of rcc and pcc retaining wall of motorable road footpath side drain flooring ing from raju pan shop to vimal tirkey azad ali house at nariyal bagicha in ward no 11
Read moreSpecial repair work of replacement of flooring of outer side, water proofing work and construction of boundary wall at bunglow no. f-8 at officer colony kampoo under section special work sub division gwalior
Special repair work of replacement of flooring of outer side, water proofing work and construction of boundary wall at bunglow no. f-8 at officer colony kampoo under section special work sub division gwalior
Read more1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreKiifb 2017 18 construction of kumbalangi keltron ferry bridge in ekm dt tender cum auction of compound wall with rr masonry for foundation superstructure with solid masonry , gate cabin kumbalanghi side
Compound wall with random rubble masonry for foundation length of 138.6m with gate and superstructure with brick work in sy.no.1862 10 sy.no.732 7,sy.no.734 13 sy.no.734 10 sy.no.732 5
Read moreDismantling of damaged brick wall and construction of reinforced cement concrete side wall at effluent treatment plant
Dismantling of damaged brick wall and construction of reinforced cement concrete side wall at effluent treatment plant
Read moreof your Industry type