Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
05/Se/Dc 8/Ded 81/2026 2027
|
| Description |
Interior Work Of Nbems Office Space, Block Iv, Plate B, 2nd, 3rd, 4th Floor, Nbcc Commercial Complex, East Kidwai Nagar, New Delhi (Sh: Civil, Furniture Electrical Works)
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 158308 |
|
Reference Number |
NIT No. : 10058/NIRMAN/ /2024-25, Dt. 29/08/2024 |
| Tender Fee | 0 |
| EMD | 30.43 Lakh |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243135383330382430352f53452f44432d382f4445442d38312f323032362d32303237 |
| Start Date | June 16, 2026 01:45 |
| End Date |
Expired
30/06/2026
Expired 109 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Android electronic total station,1st year extended warranty charges,2nd year extended warranty charges,3rd year extended warranty charges,4th year extended warranty charges
Android electronic total station,1st year extended warranty charges,2nd year extended warranty charges,3rd year extended warranty charges,4th year extended warranty charges
Read moreEngineering, procurement and construction (epc) for signalling & telecom works in connection with the 3rd and 4th line between chirailapothu to paharpur and koderma to pradhankhunta (exclusive) (total- 242 km approx) of east central railway
Engineering, procurement and construction (epc) for signalling & telecom works in connection with the 3rd and 4th line between chirailapothu to paharpur and koderma to pradhankhunta (exclusive) (total- 242 km approx) of east central railway
Read moreAlternator 24 volts 45 amp,lock assy gate side lh,driven plate for clutch,assy mag valve,synchroring 5th speed,shifter sleeve 1st 2nd and 3rd 4th,pin retention,compression spring,carrier,suspension bush kit,cable comp speedometer,cable comp front brake
Alternator 24 volts 45 amp,lock assy gate side lh,driven plate for clutch,assy mag valve,synchroring 5th speed,shifter sleeve 1st 2nd and 3rd 4th,pin retention,compression spring,carrier,suspension bush kit,cable comp speedometer,cable comp front brake
Read moreAutomated microbial identification and antibiotic susceptibility system,yeastone,yeastone broth,deminerauzed water 5ml,gram positive ast plate,muellerhinton broth w tes,myconon tb mic plate rapd growing,mtco non tb mic plate slow growing,mueller hinton w tes oadc ruo 10x 11ml,plate dry ruo anaerobe manual,supplemented brucella broth,gram negative ast plate with colistin cza p t,doseheads for sensititre aim tm for plate inoculation,cmc for 1st year,cmc for 2nd year,cmc for 3rd year,cmc for 4th year,cmc for 5th year,cmc for 6th year,cmc for 7th year,cmc for 8th year
Automated microbial identification and antibiotic susceptibility system,yeastone,yeastone broth,deminerauzed water 5ml,gram positive ast plate,muellerhinton broth w tes,myconon tb mic plate rapd growing,mtco non tb mic plate slow growing,mueller hinton w tes oadc ruo 10x 11ml,plate dry ruo anaerobe manual,supplemented brucella broth,gram negative ast plate with colistin cza p t,doseheads for sensititre aim tm for plate inoculation,cmc for 1st year,cmc for 2nd year,cmc for 3rd year,cmc for 4th year,cmc for 5th year,cmc for 6th year,cmc for 7th year,cmc for 8th year
Read moreEngineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Read moreInterior fit-out works for railtel office at office block-i, plate-a, 5th floor, east kidwai nagar, new delhi
Civil and interior work, plumbing work, electrical works, fire fighting, fire alarm, cctv, it networking, active and passive, audio video works, furniture etc.
Read moreInterior furnishing of phase-a allotted to stpi-hq at east kidwai nagar, delhi
Comprehensive design consultancy for interior furnishing of phase-a allotted to stpi-hq at east kidwai nagar, delhi
Read moreReplacement of old clarifier 3rd and 4th compartment tray plate and side plate labour contract
Replacement of old clarifier 3rd and 4th compartment tray plate and side plate labour contract
Read moreSupply of novoeight recombinant factor viii 3rd generation iv use (inj turoctocog alfa_ 1000iu/vial
Read more
Renewal of bt road amaithisolai 3rd east street-1 115095s2189 amaithisolai 4th east street 115095s2190 amaithisolai 5th east street 115095s2191 amaithisolai 2nd west street 115095s2192 amaithisolai 3rd west street 115095s2193 amaithisolai 4th west st
Renewal of bt road amaithisolai 3rd east street-1 115095s2189 amaithisolai 4th east street 115095s2190 amaithisolai 5th east street 115095s2191 amaithisolai 2nd west street 115095s2192 amaithisolai 3rd west street 115095s2193 amaithisolai 4th west st
Read moreof your Industry type