Tender Details
Particulars | Details |
---|---|
Title |
Aqua Da 1 Ch 2,Aqua Pa Control And Power Amp Ch2
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 06, 2025 18:08 |
End Date |
27/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreRedevelopment of plot bearing c.s. no. 6 148 abhyuday nagar, kalachowki by mhadb through a construction cum development contract by appointment of c and da 2025
Redevelopment of plot bearing c.s. no. 6 148 abhyuday nagar, kalachowki by mhadb through a&#x0d construction cum development contract by appointment of c and da
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreSupply of topographical equipments for hiu, wrd under airbmp lot 2 supply, installing and commissioning of mechanical total station and robotic total station with accessories for hiu, wrd under airbmp
Supply of topographical equipments for hiu, wrd under airbmp&#x0d lot 2 supply, installing and commissioning of mechanical total station and robotic total station with accessories for hiu, wrd under airbmp
Read moreSupply of siddha medicines to nrhm wings under the control ofcommissioner of indian medicine and homoeopathy department
Supply of siddha medicines to nrhm wings under &#x0d the control ofcommissioner of indian medicine &#x0d and homoeopathy department
Read more81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type