Tender Details

About Tender

🛣️ Invitation For Bids: Operation And Maintenance Of Nh 28(new Nh 27) 🛣️ The National Highways Authority Of India (Nhai) Is Seeking Bids From Experienced Entities For The Operation And Maintenance Of The 4 Laning Of The Ayodhya Gorakhpur Section Of Nh 28 (Now Nh 27), Spanning From Km 142.810 To Km 252.860, A Total Length Of 110.05 Km In The State Of Uttar Pradesh. 📅 Bid Submission Deadline: May 10, 2024, 12:00 Pm Tender Fee: Inr 25,000 Emd: Not Applicable Interested Bidders Must Possess The Requisite Expertise And Experience In Highway Operation And Maintenance. Detailed Proposals, Including Financial Bids, Operational Plans, And Maintenance Strategies, Are To Be Submitted By The Deadline. Keywords: Nhai, Operation And Maintenance, Highway Infrastructure, Nh 28, Nh 27, Gorakhpur, Uttar Pradesh, Government Tender, Infrastructure Development
Particulars Details
Title
Operation And Maintenance Of 4 Laning Of Ayodhya Gorakhpur Section (From Km. 142.810 To Km 252.860) Of Nh 28(new Nh 27)
Description
Operation And Maintenance Of 4 Laning Of Ayodhya Gorakhpur Section (From Km. 142.810 To Km 252.860) Of Nh 28(new Nh 27) In The State Of Uttar Pradesh, Total Length 110.05 Km
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_190759_1
Reference
Number
PIU-GKP/NH-27/OM/23-24/01
Tender Fee 25000
EMD 0
Tender Value
Place Gorakhpur
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=208896

Start Date March 11, 2024 19:30
End Date
Expired 10/05/2024

Expired 808 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more

Development, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Operation and maintenance of 4-laning of ayodhya - gorakhpur section (from km. 142.810 to km 252.860) of nh-28 (new nh-27)

Operation and maintenance of 4-laning of ayodhya - gorakhpur section (from km. 142.810 to km&#x0d 252.860) of nh-28(new nh-27) in the state of uttar pradesh, total length 110.05 km

Read more
Operation and maintenance of 4-laning of gorakhpur-kasia-up bihar border section (from km. 285.002 to km. 366. 117) of nh-28 (new nh-27)

Operation and maintenance of 4-laning of gorakhpur-kasia-up bihar border section (from km. 285.002 to km. 366. 117) of nh-28 (new nh-27)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise