(A)lowering Of 02 Nos. 4000 Gpm Pump Motor Of Jarlahi Sump (B)lowering Of 02 Nos. Pontoon Along With Their Ht Pump Motor Of Main Patch Sump Due To Decrease Of Water Level (C)other Misc. Jobs Related To Pumping And Pipe Line Work Under Ampc.
|
| Description |
(A)lowering Of 02 Nos. 4000 Gpm Pump Motor Of Jarlahi Sump (B)lowering Of 02 Nos. Pontoon Along With Their Ht Pump Motor Of Main Patch Sump Due To Decrease Of Water Level (C)other Misc. Jobs Related To Pumping And Pipe Line Work Under Ampc.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_336437_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2025-26/026 |
| Tender Fee | 0 |
| EMD | 3800 |
| Tender Value | - |
| Place | AMP COLLIERY, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348761 |
| Start Date | May 30, 2025 00:00 |
| End Date |
Expired
09/06/2025
Expired 489 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi main patch sump,ampc.
(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi 
 main patch sump,ampc.
Read moreShifting of 02nos.4000gpm pump motor of jarlahi patch sump from the ground level to the pontoon and di of their pipeline due to increase of water level of the sump and maintenance of both the pump and their pipelineof jarlahi patch,ampc.
Shifting of 02nos.4000gpm pump motor of jarlahi patch sump from the ground level to the pontoon and di of their pipeline due to increase of water level of the sump and maintenance of both the pump and their pipelineof jarlahi patch,ampc.
Read moreLowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Lowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Read more(a)shifting of 02nos.pontoon along with 4000gpm pump of jarlahi sump towards east side sump near ground level and di their pipeline b)installation of a 4000gpm pump on the ground level of jarlahi patch and erection its delivery,ampc.
(a)shifting of 02nos.pontoon along with 4000gpm pump of jarlahi sump towards east side sump near ground level and di their pipeline b)installation of a 4000gpm pump on the ground level of jarlahi patch and erection its delivery,ampc.
Read moreReplacing of b/d motor of 4000gpm pump installed on 1st pontoon of jarlahi sump and diversion of its pipe line (due to mining activity) for fast dewatering of mine water of jarlahi sump of phularitand, amp colliery.
Replacing of b/d motor of 4000gpm pump installed on 1st pontoon of jarlahi sump and diversion of its pipe line (due to mining activity) for fast dewatering of mine water of jarlahi sump of phularitand, amp colliery.
Read moreShifting of 4000gpm pump motor of jarlahi sump from pontoon and installation on ground level and maintenance of the above pump and reorganise its pipeline and transporting of pontoon to the fb for necessary repairing at phularitand, ampc.
Shifting of 4000gpm pump motor of jarlahi sump from pontoon and installation on ground level and maintenance of the above pump and reorganise its pipeline and transporting of pontoon to the fb for necessary repairing at phularitand, ampc.
Read more(a) lowering two 4000gpm pump set of jharna sump (b) installation of two set of drum pontoon in jharna sump and shifting of two set of 4000gpm pump set from ground level to the pontoon(c) maintenance of two ht pump of 3rd patch sump, muraidih, ampc.
(a) lowering two 4000gpm pump set of jharna sump (b) installation of two set of drum pontoon in jharna sump and shifting of two set of 4000gpm pump set from ground level to the pontoon(c) maintenance of two ht pump of 3rd patch sump, muraidih, ampc.
Read moreMarching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.
Marching of 2nd 4000gpm pump motor (three times) 
 of jarlahi sump along with di of its pipe line due 
 to mining activity at phularitand, amp colliery.
Read moreMarching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.
Marching of 2nd 4000gpm pump motor (three times) 
 of jarlahi sump along with di of its pipe line due 
 to mining activity at phularitand, amp colliery.
Read more(a)di 6.6kv o/h line from jarlahi viewpoint to jarlahi face due to smooth power supply to 4000gpm pump motor b)repairing of ab switch damaged due to storm along with providing and fitting disc insulator against damaged disc insulator at ampc
(a)di 6.6kv o/h line from jarlahi viewpoint to jarlahi face due to smooth power supply to 4000gpm pump motor b)repairing of ab switch damaged due to storm along with providing and fitting disc insulator against damaged disc insulator at ampc
Read moreof your Industry type