Tender Details
Particulars | Details |
---|---|
Title |
Inj Texableed 20 Ml,Inj Frusmide 10ml,Inj Tonophosphan 30 Ml,Gloves With Full Length Sleeves Pkt Of
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 17, 2025 01:30 |
End Date |
07/06/2025 ( 21 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)