Tender Details
Particulars | Details |
---|---|
Title |
Custom Bid For Services Procurement And Installation Of 38 Nos Of High Speed Broadband Connection
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 28, 2025 22:04 |
End Date |
19/05/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConsultancy services for preparation of dpr for construction of buxar bhagalpur high speed corridor expressway in the state of bihar
Consultancy services for preparation of dpr for construction of buxar bhagalpur high speed corridor expressway in the state of bihar
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn bhopal
Read moreConsultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Consultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Read moreSupply installation commissioning of cavitron ultrasonic surgical aspirator cusa for the dept of surgical gastroenterology liver transplantation and dept of pediatric surgery at aiims bhubaneswar
Supply installation commissioning of cavitron ultrasonic surgical aspirator cusa for the dept of surgical gastroenterology liver transplantation and dept of pediatric surgery at aiims bhubaneswar
Read moreConsultancy services for traffic simulation model, road safety audit and city logistic plan for navi mumbai and thane cities of maharashtra
Consultancy services for traffic simulation model, road safety audit and city logistic plan for navi mumbai and thane cities of maharashtra
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreof your Industry type