Particulars | Details |
---|---|
Title |
Under The Electricity Distribution Division, Mehdawal Replacement Of Burnt And Damaged Transformers, Unloading And Loading By Crane For Quick Installation Of Transformers.
|
Description |
Under The Electricity Distribution Division, Mehdawal Replacement Of Burnt And Damaged Transformers, Unloading And Loading By Crane For Quick Installation Of Transformers.
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1180 |
EMD | 4000 |
Tender Value | |
Place | Santkabirnagar |
Link |
AAAAAAAAAA Login to view |
Start Date | June 13, 2025 21:30 |
End Date |
23/06/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreReplacement of acsr panther conductor alongwith all hardware,accessories and disc insulators for 132kv nimbahera -choti sadri -barawarda -pratagarh line (69.4kms) (exculding lilo section of 132kvgss barawarda) under bn-9015002505
Replacement of acsr panther conductor alongwith all hardware,accessories and disc insulators for 132kv nimbahera -choti sadri -barawarda -pratagarh line (69.4kms) (exculding lilo section of 132kvgss barawarda) under bn-9015002505
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read more2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
Read moreWork of replacement of defective oil level indicator (mog), air cell and other miscellaneous works of 40 mva transformer-ist (cgl make) at 132 kv sub-station jaspur under 220 kv oandm division, mahuakheraganj
Work of replacement of defective oil level indicator (mog), air cell and other miscellaneous works of 40 mva transformer-ist (cgl make) at 132 kv sub-station jaspur under 220 kv oandm division, mahuakheraganj
Read moreAssistance in carrying out miscellaneous routine works for prive maintenance of 220kv substation, mahuakheraganj and 132kv substation jaspur under 220kv oandm division, mahuakheraganj
Assistance in carrying out miscellaneous routine works for prive maintenance of 220kv substation, mahuakheraganj and 132kv substation jaspur under 220kv oandm division, mahuakheraganj
Read moreReplacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Read moreWbpwd/pw(r)/se/shc/nit no 07 of 2025-2026(sl-01)
Sonarpur-chekbaria road, from 0.00 km to 2.515 km, permanent restoration work damaged due to road cutting for laying of water supply pipe line under amrut 2.0 project under rajpur-sonarpur municipality, under south 24-parganas highway division in th
Read moreRemoval of oil from removed bt and shifting to different rss, hiring of crane with skilled men power and vehicle for handling of bm/cb, and supply and installation of cad welding connections of 70sqmm cu cable on track rail of dmrc/tr wing in dmrc.
Removal of oil from removed bt and shifting to different rss, hiring of crane with skilled men power and vehicle for handling of bm/cb, and supply and installation of cad welding connections of 70sqmm cu cable on track rail of dmrc/tr wing in dmrc.
Read moreof your Industry type