Tender Details

Particulars Details
Title
Tn 28 Work No.6
Description
Annual Repairs And Maintenance Of 1) Mdr 54 K.M. 0/00 To 8/500, 2) Mdr 95 K.M. 0/00 To 12/800, 3) Mdr 99 K.M. 0/00 To 18/800, 4) Mdr 94 K.M. 0/00 To 8/00, Tal. Malegaon, Dist. Nashik
Organisation Government of Maharashtra
Tender Id 2023_PWR_928572_6
Reference
Number
Tender Notice No. 28 for 2023-2024
Tender Fee 1180
EMD 71000
Tender Value
Place Executive Engineer, P. W. Division, Malegaon
Link https://mahatenders.gov.in
Start Date July 25, 2023 00:25
End Date

03/08/2023 ( Expired 654 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Read more
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Read more
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise