Tender Details

Particulars Details
Title
Dismantling, Repairing And Re Fitting Of 52subsets Of 630mm B/E, Along With Tail Tumbler Side Cover, Front And Back Liner With Mother Angle, Casing Liner Gear Box Maintenance Of 223, B/E Of Main Plant Of K/W.
Description
Dismantling, Repairing And Re Fitting Of 52subsets Of 630mm B/E, Along With Tail Tumbler Side Cover, Front And Back Liner With Mother Angle, Casing Liner Gear Box Maintenance Of 223, B/E Of Main Plant Of K/W.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_318734_1
Reference
Number
PO/KW/E-Tender/24-25/46, Dated- 05.10.2024
Tender Fee 0
EMD 6900
Tender Value
Place KEDLA WASHERY
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330353
Start Date October 07, 2024 16:30
End Date

17/10/2024 ( Expired 187 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec

Dismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec

Read more
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery

Dismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery

Read more
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box of unit 401 of moonidih coal washery.

Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box of unit 401 of moonidih coal washery.

Read more
Replacement of 58 subsets of 1250mm bucket elevator along with tail n head sprocket assembly tumbler side cover of tail tumbler, front and back guide liner with mother angle, casing liner and gearbox maintenance of unit no. 208 bucket elevator of kw

Replacement of 58 subsets of 1250mm bucket elevator along with tail and head sprocket assembly tumbler side cover of tail tumbler, front and back guide liner with mother angle, casing liner and gearbox maintenance of unit no. 208 bucket elevator of k

Read more
Repairing of damaged tail end shaft assly and chain adjusting screw, repairing of wornout side liner and retaining plate of hopper,replacement of conveyor chain,dism. and fitting of flight assly with side plate repairing,i.r f/b no 2,phularitand.

Repairing of damaged tail end shaft assly and chain &#x0d adjusting screw, repairing of wornout side liner and &#x0d retaining plate of hopper,replacement of conveyor chain,dism. and fitting of flight assly with side plate repairing,i.r f/b no 2,phularitand.

Read more
Replacement of damaged under hopper feeding discharge chute liner along with damaged base frame of r and p gate no. 120a, 120b 120c after electromagnetic vibrofeeder dismantling and re-installation of raw coal bunker of main plant at kedla washery

Replacement of damaged under hopper feeding discharge chute liner along with damaged base frame of r and p gate no. 120a, 120b 120c after electromagnetic vibrofeeder dismantling and re-installation of raw coal bunker of main plant at kedla washery

Read more
Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery

Replacement of damaged conv. belt along with conv. gallery damaged/decayed base frame supporting and strengthening and gear box, take-up arrangement, drive and non-drive pulley maintenance alignment of unit no. 302 b/c of main plant of kedla washery

Read more
Complete repairing of 02 nos. side cover of bucket elevator and 01 no. tail tumbler of each of unit no. 222 and 223 reject chamber and middling chamber of fine coal jig of main plant of kedla washery.

Complete repairing of 02 nos. side cover of bucket elevator and 01 no. tail tumbler of each of unit no. 222 and 223 reject chamber and middling chamber of fine coal jig of main plant of kedla washery.

Read more
Repairing of wornout side liner and retaining plate of hopper,replacement of conveyor chain,dismantling and fitting of flight assly with side plate,repairing of tail end shaft assly and heavy duty chain adjusting as ir f/b no1 of phularitand,ampc.

Repairing of wornout side liner and retaining plate of hopper,replacement of conveyor chain,dismantling and fitting of flight &#x0d assly with side plate,repairing of tail end shaft assly and heavy duty chain adjusting as ir f/b no1 of phularitand,ampc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise