Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
04/Bsnl Cdv/2025 26
|
Description |
Re Construction Of Collapsed And Damaged Portions Of Compound Wall On East Side Of Gandhi Colony Staff Quarters Compound Vijayawada
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2025_BSNL_237644_1 |
Reference Number |
04/BSNL-CDV/2025-26 |
Tender Fee | 590 |
EMD | 34001 |
Tender Value | |
Place | Vijayawada |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=269972 |
Start Date | June 06, 2025 14:30 |
End Date |
16/06/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77
Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Read moreCleaning of sewage line septic tank soakage well repair replacement of broken damaged sewer line septic tank soakage well and repair maintenance of existing perimeter security wall chain link fencing, compound wall gate pillar plastering
Cleaning of sewage line septic tank soakage well repair replacement of broken damaged sewer line septic tank soakage well and repair maintenance of existing perimeter security wall chain link fencing, compound wall gate pillar plastering
Read moreConstruction of boundary wall and allied infrastructure at muktyala in nw4 on epc mode schb
Construction of boundary wall and allied infrastructure at muktyala in nw4 on epc mode schb
Read moreConstruction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex
Construction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreZone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Read moreConstruction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)
Construction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)
Read moreof your Industry type