Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Vrb At Km 22.100 On Chanda Dy
|
| Description |
Construction Of Vrb At Km 22.100 On Chanda Dy
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPIDC_830759_1 |
|
Reference Number |
03/EE/IDS/SLN/2023-24(Lot 1) |
| Tender Fee | 766 |
| EMD | 16000 |
| Tender Value | - |
| Place | E.E. ID Sultanpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | August 21, 2023 19:30 |
| End Date |
Expired
14/09/2023
Expired 1115 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreConstruction of vrb at km 27.730 on chanda dy
Construction of vrb at km 27.730 on chanda dy
Read moreConstruction of vrb on jindana dy at km 11.195
Construction of vrb on jindana dy at km 11.195
Read moreConstruction of vrb at km 8.500 on singramau dy
Construction of vrb at km 8.500 on singramau dy
Read moreof your Industry type