Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Four Laning Of Nh 146 In Madhya Pradesh 🛣️ The National Highways Authority Of India (Nhai), Under The Public Sector Undertakings, Invites Bids For The Four Laning Of National Highway (Nh) 146 From Design Chainage Km 59.475 (Existing Chainage Km 81.240 Near Vidisha) To Design Chainage Km 88.600 (Existing Chainage Km 110.315 Near Gyaraspur) In Madhya Pradesh On Hybrid Annuity Mode (Ham) Under The Bharatmala Pariyojana (Bmp). 📅 Bid Submission Deadline: May 9, 2024, 11:00 Am Tender Fee: Inr 500,000 Earnest Money Deposit (Emd): Inr 46,900,000 Interested Bidders Must Submit Detailed Technical And Financial Bids, Adhering To The Specifications And Guidelines Provided In The Tender Document. Keywords: Nhai, Four Laning, Nh 146, Madhya Pradesh, Ham, Bmp, Infrastructure Project, Highway Construction, Bid Invitation, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Four Laning Of Nh 146 From Design Chainage Km 59.475 (Existing Chainage Km 81.240 Near Vidisha) To Design Chainage Km 88.600 (Existing Chainage Km 110.315 Near Gyaraspur) In Madhya Pradesh On Ham Under Bmp
|
| Description |
Four Laning Of Nh 146 From Design Chainage Km 59.475 (Existing Chainage Km 81.240 Near Vidisha) To Design Chainage Km 88.600 (Existing Chainage Km 110.315 Near Gyaraspur) In Madhya Pradesh On Ham Under Bmp
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_169737_1 |
|
Reference Number |
- |
| Tender Fee | 50000 |
| EMD | 4.69 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=185954 |
| Start Date | October 05, 2023 22:30 |
| End Date |
Expired
25/11/2024
Expired 689 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreIndependent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Read more4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Read moreConstruction/improvement of existing cl-9 road to nhdl specification with paved shoulder from design chainage km 0.00 (zadong) to km 6.880 (net length 6.880 km) on road zadong-donkyala-kerang (nh 310 a) in the state of sikkim under project swastik
Construction / improvement of existing cl-9 road to nhdl specification with paved shoulder from design chainage km 0.00 (zadong) to km 6.880 (net length 6.880 km) on road zadong-donkyala-kerang (nh 310 a) in the state of sikkim under project swastik
Read moreof your Industry type