Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Periodical Renewal Of Road From Bamancherra To Chankap Basti (Tr 04 67) Under Salema Sub Division, Pwd(r And B) From Ch. 0.00 Km To Ch. 1.060 Km During The Year 2024 25
|
| Description |
Re Carpeting, Roadside Drain Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_53260_1 |
|
Reference Number |
26/EE/PWD(R and B)/KMP/DIV/2024-25 |
| Tender Fee | 1000 |
| EMD | 48538 |
| Tender Value | - |
| Place | Salema |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54117 |
| Start Date | September 25, 2024 21:30 |
| End Date |
Expired
03/10/2024
Expired 743 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Periodical renewal of pmgsy handed over road from k-a road (salema market) to west singhinala via salema phc (l-044) from ch. 0.00 km to ch. 2.657 km under salema r.d block during the year 2023-24 (length considered - 2.657 km, package no. tr-04-196)
Re-carpeting, surface drain etc.
Read moreMtc. of road from singhaghar colony to chankap basti from ch. 0.00 km to ch. 1.711 km during the year 2025-26 sh - carpeting surface drain etc. (length considered - 1.711 km)
Carpeting surface drain etc. (length considered - 1.711 km)
Read moreFdr and periodical renewal of road from ka road to ka road via salema block tilla from ch. 0.00 km to ch. 0.90 km during the year 2024-25
Re-carpeting, surface drain etc.
Read morePeriodical renewal of pmgsy handed over road from ashapurna roaja para to twisakator(l-042) from ch. 0.00 km to ch. 2.455 km under salema rd block during the year 2023-24.(length considered -2.455 km package no. tr-04-196).
Re-carpeting, surface drain etc.
Read morePeriodical renewal of road from mendi to malakar basti (l-046) from ch. 0.00 km to ch. 1.091 km during the year 2024-25
Re-carpeting, surface drain etc.
Read moreFdr and periodical renewal of road from dabbari to chengmungie road (simbukchak) from ch. 0.00 km to ch. 20344 km under salema sub-division, pwd(r and b) during the year 2024-25
Re-carpeting, roadside drain etc.
Read moreFdr and periodical renewal of road from ka road to panboa bazar via nakashipara phc from ch. 0.00 km to ch. 3.00 km under salema sub-division, pwd(r and b) during the year 2024-25
Re-carpeting, roadside drain etc.
Read moreShifting of existing di_upvc drinking water pipeline along with other accessories ing from ambassa to salema border towards ambassa (ch-0.00 to ch-4.00km)
Shifting of existing di_upvc drinking water pipeline along with other accessories ing from ambassa to salema border towards ambassa (ch-0.00 to ch-4.00km)
Read morePeriodical renewal of road from ka road to ka road via salema block tilla from ch 0.00 km to ch 0.90 km during the year 2024-25/sh recarpeting surface drain toe wall etc (length considered 0.90 km)
Recarpeting surface drain toe wall etc (length considered - 0.90 km)
Read moreShifting of existing di/upvc drinking water pipeline along with other accessories ing from ambassa-salema border towards ambassa (ch-0.00 to ch-4.00km) (2nd call)
Shifting of existing di/upvc drinking water pipeline along with other accessories ing from ambassa-salema border towards ambassa (ch-0.00 to ch-4.00km) (2nd call)
Read moreof your Industry type