Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtc. Of Road From Singhaghar Colony To Chankap Basti From Ch. 0.00 Km To Ch. 1.711 Km During The Year 2025 26 Sh Carpeting Surface Drain Etc. (Length Considered 1.711 Km)
|
Description |
Carpeting Surface Drain Etc. (Length Considered 1.711 Km)
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 82472 |
Tender Value | |
Place | Salema |
Link |
AAAAAAAAAA Login to view |
Start Date | June 20, 2025 17:30 |
End Date |
21/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Read moreWidening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass.
Widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass.
Read moreConstruction of road from km 0.000 to km 17.812 (package-3) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.000 to km 17.812 (package-3) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 17.812 to km 55.377 (package-2) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 17.812 to km 55.377 (package-2) of bile-
 migging section (km 0.00 at migging end) of nh-913 (frontier highway) to
 intermediate lane on epc mode in the state of arunachal pradesh
Read moreConstruction of road from km 0.00 to km 27.430 (package-1) of bile- migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.00 to km 27.430 (package-1) of bile-
 migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate
 lane on epc mode in the state of arunachal pradesh
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreDevelop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreof your Industry type