Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rain Water Harvesting At Kodoli
|
| Description |
Rain Water Harvesting At Kodoli
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_SATAR_953678_6 |
|
Reference Number |
06 |
| Tender Fee | 200 |
| EMD | 640 |
| Tender Value | - |
| Place | GP Kodoli |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | October 14, 2023 15:30 |
| End Date |
Expired
25/10/2023
Expired 1072 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of motors for 200kw conveyor drive units working at pvk-5 incline, kgm area
Procurement of motors for 200kw conveyor drive units working at pvk-5 incline, kgm area
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRain water harvesting at - kaledhon
Rain water harvesting at - kaledhon tal - khatav dist- satara
Read moreRain water harvesting at- kaledhon
Rain water harvesting at- kaledhon tal - khatav dist- satara
Read moreof your Industry type