Tender Details
Particulars | Details |
---|---|
Title |
Fabrication Of Pit Top Platformwith Installation 2 Nos Of One Mtr Pulley, Dismantling Of Existing 3 Mtr Winding Engine Headgear Pulley And Replacement Of Headgear Pulley Main Girder And Ms Plate At 2 Pit(m) Under Gopalchak Colliery
|
Description |
Fabrication Of Pit Top Platformwith Installation 2 Nos Of One Mtr Pulley, Dismantling Of Existing 3 Mtr Winding Engine Headgear Pulley And Replacement Of Headgear Pulley Main Girder And Ms Plate At 2 Pit(m) Under Gopalchak Colliery
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_323323_1 |
Reference Number |
BCCL/PBA/AM(EnM)/2024-25/57 dated-14.12.2024 |
Tender Fee | 0 |
EMD | 7100 |
Tender Value | |
Place | GOPALICHAK COLLIERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335149 |
Start Date | December 14, 2024 23:30 |
End Date |
24/12/2024 ( Expired 118 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of 3 nos. of 120 mt automated weighbridge systems with 6 years o and m including 2 years guarantee period on epc mode at voc port authority
Supply, installation, testing and commissioning of 3 nos. of 120 mt automated weighbridge systems with 6 years o and m including 2 years guarantee period on epc mode at voc port authority
Read moreDismantling and relocation of two nos. of pipeline ranges from section 22 affected area for safety compliance/ dismantling, laying commissioning, interlinking of pipelines, installation of water tanker filling point, fabrication of base plate/ frame
Dismantling and relocation of two nos. of pipeline ranges from section 22 affected area for safety compliance/ dismantling, laying commissioning, interlinking of pipelines, installation of water tanker filling point, fabrication of base plate/ frame
Read moreM and r to udds in badlapur industrial area.. replacement of existing damaged 100 mmdia air valves on 500 mm dia.hdpe effluent disposal main -2 nd call.
M and r to udds in badlapur industrial area...&#x0d replacement of existing damaged 100 mm dia air valves on&#x0d 500 mm dia. hdpe effluent disposal main. -- 2nd call
Read moreDesign, fabrication, supply, installation, testing and commissioning of total 55 kw grid connected solar pv power plant with roof-top net metering, 02 nos. of 9 mtr. solar led high mast, 08 nos. of solar street light at district jail chandrapur
Design, fabrication, supply, installation, testing and commissioning of total 55 kw grid connected solar pv power plant with roof-top net metering, 02 nos. of 9 mtr. solar led high mast, 08 nos. of solar street light at district jail chandrapur
Read moreInstallation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, fabrication of tee and bends, collection of pipes, dismantling of ms pipes and other miscellaneous work in kaniha ocp
Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline
 with flange welding, fabrication of tee andends, collection of pipes, dismantling of ms pipes and other miscellaneous work in kaniha ocp
Read moreInstallation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, fabrication of tee and bends, collection of pipes, dismantling of ms pipes and other miscellaneous work in kaniha ocp
Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, fabrication of tee and bends, collection of pipes, dismantling of ms pipes and other miscellaneous work in kaniha ocp
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreDismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Read moreReplacement of 3 nos 0.5s cts to 0.2s cts of 145 kv and erection/installation of 3nos 132 kv main-bus pts at
Replacement of 3 nos 0.5s cts to 0.2s cts of 145 kv and erection/installation of 3nos 132 kv main-bus pts at 132/33 kv substation dumariyaganj
Read moreRepairing and replacement of top damaged and torned plate as per the requirement and also its supporting girder of platform (9 m x 4.5 m) of wb-iii capacity 60 mt installed at ttk ocp under rajhara area.
Repairing and replacement of top damaged and torned plate as per the requirement and also its supporting girder of platform (9 m x 4.5 m) of wb-iii capacity 60 mt installed at ttk ocp under rajhara area.
Read moreof your Industry type