Fabrication Of Pit Top Platformwith Installation 2 Nos Of One Mtr Pulley, Dismantling Of Existing 3 Mtr Winding Engine Headgear Pulley And Replacement Of Headgear Pulley Main Girder And Ms Plate At 2 Pit(m) Under Gopalchak Colliery
|
Description |
Fabrication Of Pit Top Platformwith Installation 2 Nos Of One Mtr Pulley, Dismantling Of Existing 3 Mtr Winding Engine Headgear Pulley And Replacement Of Headgear Pulley Main Girder And Ms Plate At 2 Pit(m) Under Gopalchak Colliery
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_323323_1 |
Reference Number |
BCCL/PBA/AM(EnM)/2024-25/57 dated-14.12.2024 |
Tender Fee | 0 |
EMD | 7100 |
Tender Value | |
Place | GOPALICHAK COLLIERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335149 |
Start Date | December 14, 2024 23:30 |
End Date |
24/12/2024 ( Expired 167 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fixing of nut bolt and fabrication of head gear top platform fencing for 02 nos pit of central kajora colliery
Fixing of nut bolt and fabrication of head gear top platform fencing for 02 nos pit of central kajora colliery
Read moreReplacement of 10 mtr. long stp pole with 9 mtr. long octagonal poles on dividing road sector-4 and 6 upto it park in sector-6 mdc panchkula and providing 3 nos. 200 kva transformers and ht/lt line in sector-2 mdc panchkula. (including six years defe
Replacement of 10 mtr. long stp pole with 9 mtr. long octagonal poles on dividing road sector-4 and 6 upto it park in sector-6 mdc panchkula and providing 3 nos. 200 kva transformers and ht/lt line in sector-2 mdc panchkula. (including six years defe
Read moreReplacement of 3 nos 0.5s cts to 0.2s cts of 145 kv and erection/installation of 3nos 132 kv main-bus pts
Replacement of 3 nos 0.5s cts to 0.2s cts of 145 kv and erection/installation of 3nos 132 kv main-bus pts at 132/33 kv substation dumariyaganj
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreFabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Fabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Read moreTransportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreReplacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreDismantling, lifting, transportation of the vct boiler no. wbl 9251 from ramanagar unit pit no. 3 and installation at pit no. b of pandaveswar colliery, under pandaveswar area
Dismantling, lifting, transportation of the vct boiler no. wbl 9251 from ramanagar unit pit no. 3 and installation at pit no. b of pandaveswar colliery, under pandaveswar area
Read moreE.l.d.c no/s.m.ii/p1/ 1294/ 2025 supply installation and commissioning of 7 nos of 58.5 kva diesel generator sets for 7nos of gcc burial ground in zones 2 3 4 and 5 north region with comprehensive amc for a periodof 5 years after one yr warranty
Supply installation and commissioning of 7 nos of 58.5 kva diesel generator sets for 7nos of gcc burial ground in zones 2 3 4 and 5 north region with comprehensive amc for a period of 5 years after one year warranty period
Read moreAmrut 1 0 maintenance at wtp replacement of faulty flow meter and fitting and installation of new 600 mm flow meter at clear water1 3 nos of 500mm flow meter at clear water 2 raw water 2 and stage 2 oh compound of wtp mavoor
Amrut 1 0 maintenance at wtp replacement of faulty flow meter and fitting and installation of new 600 mm flow meter at clear water1 3 nos of 500mm flow meter at clear water 2 raw water 2 and stage 2 oh compound of wtp mavoor