Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Mtps I Ca Cws Ii Sludge Disposal Pump Overhaul 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Comprehensive Overhauling And Maintenance Of Critical Components At Mettur Thermal Power Station I/Mettur Dam. The Scope Of Work Includes: 🔧 Overhauling Of Sludge Disposal Pump 🚫 Cold And Hot Water Tunnel Vent Valves 🚫 Air Vent Valves 🚫 Gate Valves 🎨 Painting Of Base Frame Channel Structures, Safety Grills, Handrails, And Oil Lines, Etc. ⏱️ Bid Submission Deadline: April 18, 2024, 2:00 Pm Tender Fee: Inr 0 Emd: Inr 2500 Interested Bidders Should Possess The Necessary Technical Expertise And Experience In Overhauling And Maintaining Similar Equipment In Power Stations. Detailed Bids Should Encompass All The Specified Works, Adhering To The Project Timelines And Quality Standards. Keywords: Mtps I Ca Cws Ii, Tneb Limited, Sludge Disposal Pump, Overhauling, Maintenance, Power Station, Tunnel Vent Valves, Air Vent Valves, Gate Valves, Painting, Mettur Thermal Power Station I, Mettur Dam, Government Tender, Emd| Particulars | Details |
|---|---|
| Title |
Mtps I Ca Cws Ii Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves And Gate Valves And Painting Of Base Frame Channel Structures Safety Grills Handrails Oil Line Etc
|
| Description |
Mtps I Ca Cws Ii Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves And Gate Valves And Painting Of Base Frame Channel Structures Safety Grills Handrails Oil Line Etc
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_425602_1 |
|
Reference Number |
CE /MTPS-I / SE / M-I /CA / OT. 422 /2023-24. |
| Tender Fee | 0 |
| EMD | 2500 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=505869 |
| Start Date | February 15, 2024 22:30 |
| End Date |
Expired
18/04/2024
Expired 910 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Read moreMtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreMtps i ca cws ii overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves and painting of base frame channel structures safety grills etc
Mtps i ca cws ii overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves and painting of base frame channel structures safety grills etc
Read moreMtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Mtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Read moreMtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves etc
Mtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves etc
Read moreMtps i ca cws ii unit iii overhauling and painting of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves etc
Mtps i ca cws ii unit iii overhauling and painting of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves etc
Read moreMtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Read moreof your Industry type