Tender Details

Particulars Details
Title
Mtps I M I Ca Cws I Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves Etc
Description
Mtps I M I Ca Cws I Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves Etc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_622590_1
Reference
Number
CE / MTPS-I / SE / M-I / CA /OT. 349 / 2025 -26
Tender Fee 0
EMD 5500
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=744520

Start Date November 12, 2025 18:30
End Date
Expired 26/11/2025

Expired 320 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc

Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc

Read more
Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27

Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27

Read more
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii

Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii

Read more
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27

Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27

Read more
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii

Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii

Read more
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Read more
Rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water services conforming to is 9763,plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water services conforming to is 9763,cast copper alloy screw down bib taps and stop valves for water services conforming to is 781

Rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,rotational moulded polyethylene water storage tanks (v3) conforming to is 12701,plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water services conforming to is 9763,plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water services conforming to is 9763,cast copper alloy screw down bib taps and stop valves for water services conforming to is 781

Read more
Mtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc

Mtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc

Read more
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Read more
Mtps i ca cws ii unit iii overhauling and painting of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves etc

Mtps i ca cws ii unit iii overhauling and painting of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves etc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise