Particulars | Details |
---|---|
Title |
Mtps I Ca Cws Ii Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves And Gate Valves And Painting Of Base Frame Channel Structures Safety Grills Etc
|
Description |
Mtps I Ca Cws Ii Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves And Gate Valves And Painting Of Base Frame Channel Structures Safety Grills Etc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463921_1 |
Reference Number |
CE / MTPS-I / SE / M-I / CA / OT.119 / 2024-25 |
Tender Fee | 0 |
EMD | 2800 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551353 |
Start Date | July 18, 2024 22:30 |
End Date |
24/07/2024 ( Expired 327 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i bm unit i boiler pressure parts aoh 2025 overhauling of secondary air dampers scanner air fans and its damper flap gate etc
Mtps i bm unit i boiler pressure parts aoh 2025 overhauling of secondary air dampers scanner air fans and its damper flap gate etc
Read moreMtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type airdrie
Mtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type air drie
Read moreMtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser
Mtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser
Read moreMtps i ca cws i overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 1a 1b and 1c and allied works
Mtps i ca cws i overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 1a 1b and 1c and allied works
Read moreMtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Read moreMtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Mtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Read moreMtps i m i ca cws i replacement of corroded worn out gi safety hand rails toe guards and safety grills inside ct id fan stack area and allied works
Mtps i m i ca cws i replacement of corroded worn out gi safety hand rails toe guards and safety grills inside ct id fan stack area and allied works
Read moreMtps i m i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier i and replacement of corroded raw water inlet pipe line of clarifier i
Mtps i m i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier i and replacement of corroded raw water inlet pipe line of clarifier i
Read moreMtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Read moreTtps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026