Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Ca Cws Ii Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves And Gate Valves And Painting Of Base Frame Channel Structures Safety Grills Etc
|
Description |
Mtps I Ca Cws Ii Overhauling Of Sludge Disposal Pump And Cold And Hot Water Tunnel Vent Valves Air Vent Valves And Gate Valves And Painting Of Base Frame Channel Structures Safety Grills Etc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463921_1 |
Reference Number |
CE / MTPS-I / SE / M-I / CA / OT.119 / 2024-25 |
Tender Fee | 0 |
EMD | 2800 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551353 |
Start Date | July 18, 2024 22:30 |
End Date |
24/07/2024 ( Expired 272 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Read moreTtps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit ii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit i cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit i cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iii cleaning of i ii pass boiler structures prds valves and pipe lines floor and disposal of fly ash debris etc from boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
Read moreMtps i ca rws misc clarifier i de watering sludge removal cleaning of complete clarifier with bleaching powder overhauling of flocculator and traction drive mechanism strengthening of corroded portion of the structures etc
Mtps i ca rws misc clarifier i de watering sludge removal cleaning of complete clarifier with bleaching powder overhauling of flocculator and traction drive mechanism strengthening of corroded portion of the structures etc
Read moreMtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii
Mtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii
Read moreMtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Read moreMtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Read moreMtps i tm ii unit i complete overhauling and painting of instrument air compressors 1a 1b 1c
Mtps i tm ii unit i complete overhauling and painting of instrument air compressors 1a 1b 1c
Read moreof your Industry type